Code Occupancy Approval | | | 9/29/2008 | | DONE |
Wm. Michael Meloy
|
|
|
|
Code Occupancy Approval | | | 9/26/2008 | | PASS |
Wm. Michael Meloy
|
|
|
Giraffe Enclose. Approved with the following change Removal of planters within the cage. The planters were a safety hazed to the giraffies and limited there space.
|
BLD-Final | 9/24/2008 | 9/24/2008 | 9/24/2008 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/24/2008 at 10:55:15 AM. Contact: ###-####.
|
DOC - Permit Finaled | 9/24/2008 | 9/24/2008 | 9/24/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 9/18/2008 | 9/19/2008 | 9/20/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/18/2008 at 2:01:59 PM. Contact: ###-####. eveything inside ok but need to finish landings outside of exit doors
|
FIRE-Final Inspection | 9/18/2008 | 9/19/2008 | 9/19/2008 | A | PASS |
Forrest France
|
|
|
Life safety completed acceptable, noted landing at the SW exit to be finished when site work is complete.
|
BLD-Framing/Rough-in | 8/29/2008 | 9/2/2008 | 9/2/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/29/2008 at 12:34:13 PM. Contact: ###-####. ok to cover graf keepers area
|
BLD-Framing/Rough-in | 8/25/2008 | 8/26/2008 | 8/26/2008 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/25/2008 at 2:39:58 PM. Contact: ###-####. shed roors at giraffe expo ok to cover
|
BLD-Framing/Rough-in | 8/22/2008 | 8/25/2008 | 8/25/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/22/2008 at 1:51:59 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/29/2008 | 7/30/2008 | 7/30/2008 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/29/2008 at 2:33:45 PM. Contact: ###-####. reviewed special insp. reports on high strength bolting. steel framing ok.
|