Permit Information
Permit NumberBLD07-02837
StatusFinaled
Name CM COMPANY
Site Address 355 JULIA DAVIS DR
Project NameZOO BOISE
Customer Number 
ePlanReviewNo
Description
Zoo Boise - African Village Adventure - (Lion Holding, School, Concession) - To Construct a new 4,173 mixed use building. Using Nonseperated uses section 302.3.1. First use is a U occupancy(Lion Holding), Second use is an A-3 occupancy(School), Third use is an A-2 occupancy(Concessions), Last use is an S-1(storage area). This building is one story and separated into its own fire area by a fire barrier wall next to the Lion Viewing area. This building is fire sprinklered. TLW
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/30/200810/1/200810/1/2008APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/30/2008 at 3:52:59 PM. Contact: ###-####.ok for perm occ
BLD-Final9/29/20089/30/200810/1/2008ADEFR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/29/2008 at 3:34:59 PM. Contact: ###-####.
BLD-Final9/30/20089/30/200810/1/2008PDEFR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/29/2008 at 3:34:59 PM. Contact: ###-####.
Code Occupancy Approval  9/26/2008 PASS
DetailsWm. Michael Meloy
BLD-Final9/18/20089/19/20089/20/2008PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/18/2008 at 2:00:18 PM. Contact: ###-####. ok for temp occ
FIRE-Final Inspection9/18/20089/19/20089/19/2008APASS
DetailsForrest France
Fire life safety inspection completed satisfactory, noted bollards at the new hydrant to be installed and verified at next site visit for project related building permits next week, hardware at the lion holding area exit okayed per review notes, inspection passed.
FIRE-Final Inspection9/17/20089/18/20089/18/2008PNR
DetailsForrest France
Need project related fire sprinkler and alarm permit work tested and finaled prior to building fire life safety approvals. Discussed items needed for final including basic fire code review note conditions.
BLD-Other9/16/20089/17/20089/17/2008PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/16/2008 at 4:28:33 PM. Contact: ###-####. ok to cover ceiling
BLD-Conference9/11/20089/12/20089/12/2008PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/11/2008 at 10:12:20 AM. Contact: ###-####.
BLD-Framing/Rough-in7/30/20087/31/20087/31/2008PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 7/30/2008 at 4:40:23 PM. Contact: ###-####.
view area ok,, also fence post holes wip,, pending special inspection
BLD-Framing/Rough-in7/24/20087/25/20087/25/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/24/2008 at 3:20:36 PM. Contact: ###-####.
BLD-Framing/Rough-in7/23/20087/24/20087/24/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/23/2008 at 2:39:52 PM. Contact: ###-####. I joist at roof structure in lion room ok to cover as well as hardlids in restrooms.
BLD-Framing/Rough-in7/11/20087/14/20087/14/2008APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/11/2008 at 4:25:40 PM. Contact: ###-####. roof sheeting and straping for lion ex ok to roof
BLD-Framing/Rough-in7/10/20087/11/20087/14/2008PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/10/2008 at 11:53:53 AM. Contact: ###-####.ceiling ok to cover
BLD-Conference5/12/20085/12/20085/12/2008PPASS
DetailsDave Hannah
craig Phone #: ###-####
BLD-Footing4/7/20084/8/20084/8/2008APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/7/2008 at 3:56:52 PM. Contact: ###-####.lion ex
BLD-Footing3/27/20083/28/20083/28/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/27/2008 at 12:22:12 PM. Contact: ###-####.
BLD-Footing3/24/20083/25/20083/25/2008APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/24/2008 at 9:58:26 AM. Contact: ###-####. bridge inbutments