BLD-Final | 2/29/2008 | 3/3/2008 | 3/3/2008 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/29/2008 at 2:10:21 PM. Contact: ###-####. ok for perm occ
|
FIRE-Final Inspection | 2/29/2008 | 3/3/2008 | 3/3/2008 | P | PASS |
Forrest France
|
|
|
Noted items from the previous inspection have been completed including door hardware, exit sign repair and provision of a current annual inspection for the existing fire sprinkler system. Fire life safety passed.
|
FIRE-Final Inspection | 3/3/2008 | 3/3/2008 | 3/3/2008 | P | DONE |
Forrest France
|
|
|
Duplicate inspection request.
|
BLD-Final | 2/28/2008 | 2/29/2008 | 2/29/2008 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/28/2008 at 4:48:24 PM. Contact: ###-####.needs fire signoffs
|
BLD-Framing/Rough-in | 2/27/2008 | 2/28/2008 | 2/28/2008 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/27/2008 at 4:43:31 PM. Contact: ###-####. ok to cover ceiling
|
BLD-Framing/Rough-in | 2/26/2008 | 2/27/2008 | 2/27/2008 | A | FAIL |
Dave Hannah
|
|
|
rader - ceiling grid Phone #: ###-#### remove rivits ect
|
BLD-Energy code compliance | 1/31/2008 | 2/1/2008 | 2/1/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/31/2008 at 11:06:16 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/29/2008 | 1/30/2008 | 1/30/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/29/2008 at 5:02:41 PM. Contact: ###-####. ok to cover int walls
|
BLD-Framing/Rough-in | 1/28/2008 | 1/29/2008 | 1/30/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/28/2008 at 4:14:16 PM. Contact: ###-####. ext shear walls on nw restroom area ok to cover
|