BLD-Final | 1/18/2008 | 1/22/2008 | 1/22/2008 | A | PASS |
Jim Storey
|
|
|
everett Phone #: ###-####
|
DOC - Permit Finaled | 1/22/2008 | 1/22/2008 | 1/22/2008 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 1/17/2008 | 1/18/2008 | 1/18/2008 | A | PASS |
Forrest France
|
|
|
No sprinkler work needed for this permit. Sprinklers were exsisting, no changes made.Life safety complete. KR
|
BLD-Final | 1/10/2008 | 1/10/2008 | 1/14/2008 | P | NR |
Jim Storey
|
|
|
everett Note: Please call 1/2 hr to meet with Phone #: ###-#### pending fire.
|
BLD-Final | 1/7/2008 | 1/8/2008 | 1/8/2008 | A | PART |
Jim Storey
|
|
|
john Phone #: ###-#### Note pleae call 1/2 hr prior to inspection si final as well as re-engineering acepped and filled in archive.
|
BLD-Foundation | 1/4/2008 | 1/7/2008 | 1/7/2008 | A | NR |
Jim Sly
|
|
|
john - please call 1/2 hr prior to inspection Phone #: ###-#### John wants final? John cannot meet me in 1/2 hr..........Told him to gather up report from MTI for Epoxy....and to provide Eng. for bolting, then recall for inspection.
|
BLD-Footing | 12/14/2007 | 12/17/2007 | 12/17/2007 | A | FAIL |
Jim Storey
|
|
|
gary Phone #: ###-#### need si for epoxy and verifaction of 5 in. embedment/ need to verrify beam thru bolt or engineer aproval of as built .
|