BLD-Final | 12/23/2008 | 12/23/2008 | 12/23/2008 | P | PASS |
Tony Young
|
|
|
JOE Phone #: ###-####
|
DOC - Permit Finaled | 12/23/2008 | 12/23/2008 | 12/23/2008 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 12/19/2008 | 12/22/2008 | 12/22/2008 | A | NR |
Dave Hannah
|
|
|
joe Phone #: ###-#### needs code enfocement final and fire life safty also no signoff card or plans on site
|
BLD-Final | 11/11/2008 | 11/12/2008 | 11/12/2008 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/11/2008 at 3:44:06 PM. Contact: ###-####. parapet extensions ok
|
BLD-Framing/Rough-in | 10/22/2008 | 10/23/2008 | 10/23/2008 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/22/2008 at 1:27:35 PM. Contact: ###-####.ok tocover parapets
|
FIRE-Final Inspection | 9/29/2008 | 10/1/2008 | 10/1/2008 | P | PASS |
Troy Cobbley
|
|
|
life safety paased
|
FIRE-Final Inspection | 9/9/2008 | 9/9/2008 | 9/9/2008 | P | CANC |
Troy Cobbley
|
|
|
Project is not ready fo the fire life safety inspection.
|
BLD-Foundation | 8/13/2008 | 8/14/2008 | 8/14/2008 | A | PART |
Tony Young
|
|
|
ean Phone #: ###-#### wip on retaining wall
|
BLD-Foundation | 8/13/2008 | 8/13/2008 | 8/13/2008 | P | PASS |
Tony Young
|
|
|
ian Phone #: ###-#### retaining wall next to Collister
|
BLD-Framing/Rough-in | 4/17/2008 | 4/17/2008 | 4/17/2008 | P | PART |
Jim Sly
|
|
|
joe Phone #: ###-#### Approx 100 ft. of Metal stud store front wall appears OK.
|
BLD-Framing/Rough-in | 4/14/2008 | 4/15/2008 | 4/15/2008 | A | PASS |
Tony Young
|
|
|
joe Phone #: ###-#### above bowling alley ok
|
BLD-Framing/Rough-in | 4/14/2008 | 4/14/2008 | 4/14/2008 | P | NR |
Tony Young
|
|
|
joe Phone #: ###-####
|
BLD-Framing/Rough-in | 4/2/2008 | 4/3/2008 | 4/3/2008 | P | PART |
Tony Young
|
|
|
joe Phone #: ###-#### lower sections by barbershop and west
|
BLD-Concrete | 4/1/2008 | 4/2/2008 | 4/2/2008 | A | PASS |
Jim Storey
|
|
|
Joe\ready now for masonary inspec. Phone #: ###-#### bolling alley and library paripet locations placed with mti pending report.
|
BLD-Concrete | 3/31/2008 | 3/31/2008 | 3/31/2008 | P | PART |
Dave Hannah
|
|
|
joe Phone #: ###-####MTI on site looking at epoxy not going to grout today
|
BLD-Framing/Rough-in | 3/27/2008 | 3/28/2008 | 3/28/2008 | A | PASS |
Tony Young
|
|
|
joe Phone #: ###-#### building 100 vacent space west of bowling alley parapet ok
|
BLD-Framing/Rough-in | 3/27/2008 | 3/27/2008 | 3/27/2008 | P | PART |
Tony Young
|
|
|
joe Phone #: ###-#### need to get more screws in steel frame wall,, will re-inspect
|
BLD-Framing/Rough-in | 3/24/2008 | 3/25/2008 | 3/25/2008 | P | PART |
Tony Young
|
|
|
Joe Phone #: ###-#### all fronts w/ wood frame ok
|
BLD-Framing/Rough-in | 3/24/2008 | 3/24/2008 | 3/24/2008 | P | PART |
Tony Young
|
|
|
joe Phone #: ###-#### library, barbershop fronts ok
|
BLD-Framing/Rough-in | 3/21/2008 | 3/21/2008 | 3/21/2008 | P | PART |
Tony Young
|
|
|
joe Phone #: ###-#### front parapet for vacent buildind east of library ok
|