BLD-Final | 6/6/2008 | 6/6/2008 | 6/6/2008 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 6/6/2008 at 9:10:02 AM. Contact: ###-####. ok for perm occ. All issues previosly noted have been corrected.
|
BLD-Final | 4/29/2008 | 4/30/2008 | 4/30/2008 | P | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/29/2008 at 3:24:14 PM. Contact: ###-####. Provide tempered glazing at window within 24in. of west exit door. Provide labeling on doors at 2hr firebarrier wall and approved hardware were needed. Architect to provide drawing of handrails, guards and ramps and asses asphalt extension of ramp and submit to plan review for approval. Asphalt portion not code compliant, hand rails, edge protection missing on opposite side.
|
FIRE-Final Inspection | 4/28/2008 | 4/29/2008 | 4/29/2008 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Code Occupancy Approval | 4/25/2008 | 4/25/2008 | 4/25/2008 | P | PASS |
Scott M.Brown
|
|
|
all in as required, final signed off
|
BLD-Other | 3/31/2008 | 3/31/2008 | 3/31/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/31/2008 at 5:58:29 AM. Contact: ###-####.
|
BLD-Other | 3/28/2008 | 3/28/2008 | 3/28/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/28/2008 at 9:22:43 AM. Contact: ###-####. 1st layer of 2hr wall on addition side.
|
BLD-Energy code compliance | 3/27/2008 | 3/28/2008 | 3/28/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/27/2008 at 11:24:44 AM. Contact: ###-####. ok to cover.
|
BLD-Energy code compliance | 3/26/2008 | 3/26/2008 | 3/26/2008 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/26/2008 at 11:00:21 AM. Contact: ###-####. Nees to remove insul. and sheetrock for elec ri insp.
|
BLD-Framing/Rough-in | 3/25/2008 | 3/25/2008 | 3/25/2008 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/25/2008 at 5:56:52 AM. Contact: ###-####. ok to insul.
|
BLD-Other | 3/13/2008 | 3/14/2008 | 3/14/2008 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/13/2008 at 1:32:47 PM. Contact: ###-####.
|
BLD-Other | 3/7/2008 | 3/10/2008 | 3/10/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/7/2008 at 7:12:43 AM. Contact: ###-####. exterior shear nail on south half og bldg. 1st. layer of 2hr. wall on addition side.
|
BLD-Other | 3/7/2008 | 3/7/2008 | 3/7/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/7/2008 at 7:11:42 AM. Contact: ###-####.
|
BLD-Concrete | 2/28/2008 | 2/29/2008 | 2/29/2008 | P | PASS |
Mike Jordan
|
|
|
mike \\pouring around 2:00 Phone #: ###-####
|
BLD-Footing | 2/26/2008 | 2/27/2008 | 2/27/2008 | A | PASS |
Mike Jordan
|
|
|
mike Phone #: ###-####. perimeter footings, and interior footings.
|
BLD-Framing/Rough-in | 2/21/2008 | 2/22/2008 | 2/22/2008 | A | PART |
Mike Jordan
|
|
|
Paul-inspection for drywall please Phone #: ###-####. 1st layer 2hr. fire barrier wall. ok.
|