Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD07-03079
StatusFinaled
Name VERTICAL CONSTRUCTION
Site Address 4614 W STATE ST
Project NameCOLLISTER SHOPPING CTR
Customer Number 
ePlanReviewNo
Description
(COLLISTER SHOPPING CENTER - BUILDING #200 - SOUTH MULTIPLE TENANT BUILDING - STOREFRONT, CANOPY, AND PARKING LOT REMODEL) (7-25-08) PLAN MODIFICATION TO CONSTRUCT A 1-HR FIRE SPRINKLER RISER ROOM WITH ACCESS DIRECTLY FROM THE EXTERIOR. This building is fire sprinklered for building area increase. To remodel the storefront and the canopy of Building #200 (South multiple tenant building). The parking lot will also be remodeled in conjunction with this permit. Work is to include new storefront glazing, new storefront glass doors, new parapets on existing exterior walls, new braces to the roof deck for new parapets, new exterior wall infills, new steel beams, new steel roof decking, exterior veneer brick, and new exterior stucco. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes. The fire sprinkler system is required to be maintained in compliance with NFPA 13 as regulated by the Fire Department. This is a shell only permit. It does NOT establish a Certificate of Occupancy for any tenant. CJW DRH07-00453
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/23/200812/23/200812/23/2008PPASS
DetailsTony Young
JOE Phone #: ###-####

DOC - Permit Finaled12/23/200812/23/200812/23/2008PPASS
DetailsTony Young
c of c issued
BLD-Final12/19/200812/22/200812/22/2008ANR
DetailsDave Hannah
joe Phone #: ###-#### no plans or sign off card on site
FIRE-Final Inspection10/2/200810/3/200810/3/2008APASS
DetailsTroy Cobbley
fire safety passed
FIRE-Final Inspection9/29/200810/1/200810/1/2008PFAIL
DetailsTroy Cobbley
Life safety will be ok to pass when the fire alarm permit is finaled
Code Occupancy Approval  9/16/2008 FAIL
The applicant has not updated the building permit plans in regard to the most up to date site plan and landscape plan. ***The applicant has utilized rock mulch on the site as opposed to a bark mulch. Also the parapets that were approved as part of DRH08-00304 and CZC08-00142 have not been constructed.

The applicant has been instructed to remove the rock mulch, update the building plans, and either construct the parapets or bond for them. 9-16-08 ANT
FIRE-Final Inspection9/9/20089/9/20089/9/2008PCANC
DetailsTroy Cobbley
Project is not ready fo the fire life safety inspection.
BLD-Framing/Rough-in8/28/20088/29/20088/29/2008APART
DetailsJim Sly
Joe Phone #: ###-####
Fire Riser room.....OK... (behind Thursdays).
BLD-Foundation4/15/20084/16/20084/16/2008PPASS
DetailsTony Young
joe - late afternoon please Phone #: ###-####
front pier ftgs for canopy on far east building
BLD-Framing/Rough-in3/18/20083/18/20083/19/2008PPART
DetailsTony Young
joe Phone #: ###-####
wip
BLD-Framing/Rough-in3/17/20083/18/20083/18/2008ANR
DetailsTony Young
joe Phone #: ###-####
BLD-Framing/Rough-in3/17/20083/17/20083/17/2008PPART
DetailsTony Young
joe Phone #: ###-####
wip on "thursdays" front
BLD-Framing/Rough-in3/14/20083/14/20083/14/2008PPART
DetailsTony Young
joe Phone #: ###-####
BLD-Framing/Rough-in3/12/20083/12/20083/12/2008PPART
DetailsTony Young
joe Phone #: ###-####
west unit 2nd from end mansord ok
BLD-Framing/Rough-in3/6/20083/11/20083/11/2008APART
DetailsTony Young
joe - early morning Phone #: ###-####
upper sectin ok wast side f east building ok,, nted on contractor set of plans
BLD-Conference3/5/20083/6/20083/6/2008APART
DetailsTony Young
joe - please call 1 hr prior to inspection Phone #: ###-####
conf about inspection requests,, will be doing demo at night and frame and cover 1st thing in mornings so bussiness can be open in morn.. will have 1st inspection on 11mar08?