BLD-Final | 3/13/2008 | 3/13/2008 | 3/13/2008 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: John Lodman ok for perm occ
|
FIRE-Final Inspection | 3/13/2008 | 3/13/2008 | 3/13/2008 | A | PASS |
Forrest France
|
|
|
Corrections verified for completion, fire life safety inspection passed.
|
Code Occupancy Approval | 3/12/2008 | 3/12/2008 | 3/12/2008 | P | PASS |
Joe R Venneman
|
|
|
Meets requirements of the exterior modifications under this permit #
|
FIRE-Final Inspection | 3/11/2008 | 3/12/2008 | 3/12/2008 | P | FAIL |
Forrest France
|
|
|
Missing signage at the terrace doors, exterior EM light did not function, not ready for final at this time.
|
Code Occupancy Approval | | | 3/12/2008 | | DONE |
|
|
|
Meets requirements of BLD07-03089 for exterior changes made
|
BLD-Framing/Rough-in | 2/28/2008 | 2/29/2008 | 2/29/2008 | P | PASS |
Dave Hannah
|
|
|
cover of soffit area pending morning fire sprinkler cover approval. Thank you. Phone #: ###-#### Internet Inspection Request from: John Lodman
|
BLD-Framing/Rough-in | 2/22/2008 | 2/22/2008 | 2/22/2008 | P | PASS |
Dave Hannah
|
|
|
Requesting partial cover approval for column wraps only. Plumbing and elect inspections for two hose bibbs and a couple of outlets are this afternoon also. Soffit cover will be requested at a later date. Phone #: ###-#### Internet Inspection Request from: John Lodman
|
BLD-Foundation | 2/18/2008 | 2/19/2008 | 2/19/2008 | A | PASS |
Dave Hannah
|
|
|
arch wraps of struct columns. epoxy dowels were inspected by MTI as discussed previously. Pour is 9:00 am today! Phone #: ###-#### Internet Inspection Request from: John Lodman
|
BLD-Foundation | 2/17/2008 | 2/19/2008 | 2/18/2008 | A | CANC |
Dave Hannah
|
|
|
architectural wraps around the steel columns Phone #: ###-#### Internet Inspection Request from: John Lodman Inspection cancelled from web by: John Lodman
|
BLD-Other | 2/12/2008 | 2/12/2008 | 2/13/2008 | P | PART |
Dave Hannah
|
|
|
john - deck pour Phone #: ###-#### spec inspection oked steel and deck ok to pour deck
|
BLD-Footing | 2/5/2008 | 2/6/2008 | 2/6/2008 | A | PASS |
Dave Hannah
|
|
|
1st thing am please- approved to start pour by Mike Jordan, need to look at exceptions. Thank you. Phone #: ###-#### Internet Inspection Request from: John Lodman
|
BLD-Footing | 2/4/2008 | 2/5/2008 | 2/5/2008 | P | PART |
Mike Jordan
|
|
|
late afternoon if possible please Phone #: ###-#### Internet Inspection Request from: John Lodman. column pad footings for terrace. footings at existing planter not per plan.
|
FIRE-Conference | 2/4/2008 | 2/5/2008 | 2/5/2008 | A | DONE |
Forrest France
|
|
|
On site visit to discuss door hardware requirements at the new terrace seating area per fire code review notes.
|
BLD-Footing | 2/4/2008 | 2/4/2008 | 2/4/2008 | P | CANC |
Dave Hannah
|
|
|
John late pm if possible Phone #: ###-####-Cancel per John Lodma on 2/4/08 @ 11:45am BAs
|