Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD07-03125
StatusFinaled
Name SILVER SAGE CONSTRUCTION
Site Address 2225 S DOROTHY AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for a two story attached single family dwelling on a zero lot line. The first story is 1000 Sq. Ft. and the second story is 519 Sq. Ft. The house also has a covered front porch of 56 Sq. Ft. and a detached garage of 440 Sq. Ft. that is attached to another garage on a separate property. Using gypsum detail WP 4135 for dwelling unit separation per all red lining, engineering, and plan review report. THE CONSTRUCTION OF THE DWELLING UNIT SEPARATION WALLS ARE DESIGNED TO MEET TOWNHOUSE CONSTRUCTION. R-2D zoning district, building setbacks, and CUP07-00058 per Planning and Zoning. (BSP)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/29/20089/29/20089/29/2008PPASS
DetailsJim Storey
steve Phone #: ###-####
DOC - Permit Finaled9/29/20089/29/20089/29/2008PPASS
DetailsJim Storey
Code Occupancy Approval  7/10/2008 DONE
PASS landscaping and elevation requirements met. Nice looking unit
Extend Permit 180 days4/18/20084/18/20084/18/2008APASS
DetailsJim Storey
garge gable protected ok to cover
BLD-Conference4/10/20084/11/20084/11/2008AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/10/2008 at 4:56:32 PM. Contact: ###-####. garge gable must be 2 hr no eave per plan
BLD-Wall cover4/8/20084/8/20084/8/2008APASS
DetailsJim Storey
dewelling fire wall ok
BLD-Energy code compliance4/4/20084/4/20084/4/2008PPASS
DetailsJim Storey
Steve; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Framing/Rough-in4/2/20084/3/20084/3/2008APART
DetailsJim Storey
steve Phone #: ###-#### repair fire walls at upper pick points to maintane ratting/ fire blk. stairs at unusable space. ok to insulate.
BLD-Conference2/20/20082/20/20082/20/2008PPART
DetailsJim Storey
Steve Phone #: ###-#### 2 hr gyp ok on p/l walls
BLD-Conference2/14/20082/15/20082/15/2008APASS
DetailsJim Storey
Steve Phone #: ###-#### reviewed plan w/frammer
BLD-Footing2/6/20082/7/20082/7/2008PPASS
DetailsJim Storey
terry Phone #: ###-####
BLD-Footing2/4/20082/5/20082/5/2008PPASS
DetailsJim Storey
steve Phone #: ###-####