BLD-Final | 2/13/2009 | 2/13/2009 | 2/13/2009 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/13/2009 at 8:55:04 AM. Contact: ###-####. copy of si report recieved and aproved will archive. final ok card signed on site.
|
FIRE-Final Inspection | 2/11/2009 | 2/12/2009 | 2/12/2009 | P | PASS |
Troy Cobbley
|
|
|
Fire/Life Safety passed
|
FIRE-Final Inspection | 12/29/2008 | 12/30/2008 | 12/30/2008 | A | DONE |
Troy Cobbley
|
|
|
The new addition is passed the fire life safety inspection except the large pre-action computer room which still needs the hvac shut down and the alarm strobe repaired as noted on the project related fire alarm activities. Also the two rooms being remodeled in the existing portion of the facility need to be finished prior to a final on this project.
|
BLD-Other | 11/4/2008 | 11/4/2008 | 11/4/2008 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/4/2008 at 7:36:14 AM. Contact: ###-####. ceiling grid at meeting rooms ok.
|
BLD-Other | 10/28/2008 | 10/29/2008 | 10/29/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/28/2008 at 3:34:46 PM. Contact: ###-####. Ceiling grid in data room ok.
|
BLD-Final | 10/27/2008 | 10/28/2008 | 10/28/2008 | A | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/27/2008 at 1:28:27 PM. Contact: ###-####.
|
BLD-Other | 10/28/2008 | 10/28/2008 | 10/28/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/27/2008 at 1:28:27 PM. Contact: ###-####. Ceiling grid, pend. elec. ri. insp. Install not completed. waiting for additional info from architect on grid type. Also requested letter from unistrut stating system was installed per manufactures recomendations. Will call for reinspection in the am.
|
BLD-Wall cover | 8/25/2008 | 8/26/2008 | 8/26/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/25/2008 at 4:09:15 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/21/2008 | 7/22/2008 | 7/22/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/21/2008 at 3:29:20 PM. Contact: ###-####. perimeter fur out walls against tilt up panels. pend. elec. ri insp.
|
BLD-Concrete | 6/4/2008 | 6/5/2008 | 6/5/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 6/4/2008 at 4:27:22 PM. Contact: ###-####. Reinforcement for concrete tilt panels #7-12 and#19-21. ok.
|
BLD-Aging Inspection | 5/13/2008 | 5/13/2008 | 5/14/2008 | | PART |
Mike Jordan
|
|
|
wip.
|
BLD-Concrete | 5/8/2008 | 5/9/2008 | 5/9/2008 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/8/2008 at 4:03:31 PM. Contact: ###-####. Panels for East wall of addition appear OK pending special inspection, tests and approvals from MTI.
|
BLD-Footing | 4/22/2008 | 4/23/2008 | 4/23/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/22/2008 at 5:00:07 PM. Contact: ###-####. Footing for tilt panels at existing bldg. and at northside elevation change. Noted special insp. on site.
|
BLD-Footing | 4/3/2008 | 4/4/2008 | 4/4/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/3/2008 at 8:58:43 AM. Contact: ###-####. South and west perimeter footings for west addition, interior colun pad foorings for west addition. Noted that MTI is the special insp. agency and will be their for the conc. placement.
|