Permit Information
Permit NumberBLD07-03163
StatusFinaled
Name PETRA INC
Site Address 898 W GOWEN RD
Project NameNORCO FILL PLANT
Customer Number 
ePlanReviewNo
Description
Norco Fill Plant - To construct a new 52,500 square foot, one story, steel framed industrial building and related site improvements. This building contains an office area with restrooms, training/break room, conference room and lab. The building will also contatain a cylinder maintenance and repair area, flammable gas storage room and large cylinder fill and process area. This building will be fully fire sprinkled. This building is at 100 percent of allowable area. The 30 foot perimeter yards must be permanently maintained and no building addition will be allowed to this building nor may any additional H occupancy area be created within the building. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/20/20097/20/20097/20/2009PPASS
DetailsJim Storey
Jim-ACHD is ok with us to final so do what you need to do I guess.......Barb bld final ok
BLD-Aging Inspection6/22/20096/22/20096/22/2009 PASS
DetailsJim Storey
passed on 4/13
FIRE-Final Inspection4/13/20094/13/20094/13/2009PPASS
DetailsForrest France
Fire life safety inspection passed, correction notice items completed.
BLD-Final4/13/20094/13/20094/13/2009PPASS
DetailsJim Storey
BLD-Conference2/12/20092/20/20092/20/2009APASS
DetailsJim Storey
Applicant has requested a joint conference inspection with Electrical at 9:00 a.m. Contact Cornel Larson ###-####; Phone #: ###-####
BLD-Aging Inspection1/23/20091/23/20091/23/2009 NR
DetailsJim Storey
equment instal is still underway and should be certified first part of feb. 09 requist for final will be called in upon completion.
Code Occupancy Approval  10/13/2008 PASS
DetailsAndrea Tuning
BLD-Final10/10/200810/10/200810/10/2008APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/10/2008 at 7:13:28 AM. Contact: ###-####. temp ok pending others ok for equment set up and production.
BLD-Other10/7/200810/7/200810/7/2008APASS
DetailsJim Storey
fire stopping complet in restaroon and at drinking foutian
FIRE-Final Inspection10/6/200810/6/200810/6/2008APART
DetailsForrest France
Items needed prior to permit fire life safety final include repair one EM exit discharge light at the main entry, spin the SW hydrant 180 deg. to face the building, provide one fire extinguisher at the cylinder pick/sort area #132 when racking is installed, the spray booth fire sprinkler permit work needs to be completed inspected and approved, noted work at the fuel island is not finished at this time. Recieved signed letter from Musgrove Engineering regarding gas control system functionality per design requirements. Okay to begin equipment installation per agreements on file.
FIRE-Alarm Testing10/6/200810/6/200810/6/2008ADONE
DetailsForrest France
Duplicate inspection request.
BLD-Final10/6/200810/6/200810/6/2008AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/6/2008 at 7:19:10 AM. Contact: ###-####. fire stopping
FIRE-Final Inspection9/30/200810/1/200810/1/2008ANR
DetailsForrest France
Need project related fire alarm and sprinkler permit finals prior to building life safety approvals.
FIRE-Conference9/11/20089/12/20089/12/2008ADONE
DetailsForrest France
Regarding project inspection schedule including related fire alarm and sprinkler permit work.
BLD-Conference9/11/20089/12/20089/12/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/11/2008 at 3:33:34 PM. Contact: ###-####.
BLD-Other9/3/20089/3/20089/3/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/3/2008 at 7:29:58 AM. Contact: ###-####. fire wall ok ceilling ok to drop ceilling office area. one area at mixing rm. extened to roof deck.
BLD-Other8/29/20089/2/20089/2/2008ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/29/2008 at 1:42:04 PM. Contact: ###-####.
BLD-Other8/28/20088/28/20088/28/2008PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/28/2008 at 11:19:18 AM. Contact: ###-####.
BLD-Conference8/8/20088/19/20088/19/2008APASS
DetailsJim Storey
9:00 a.m. on site conference meeting with all trades.
BLD-Framing/Rough-in8/5/20088/6/20088/6/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/5/2008 at 2:51:30 PM. Contact: ###-####.interior partions ok for cover.
BLD-Framing/Rough-in7/31/20088/1/20088/1/2008APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/31/2008 at 1:52:57 PM. Contact: ###-####. perpendiculat membrane penatration fire stopping ok for cover.
BLD-Framing/Rough-in7/30/20087/30/20087/30/2008PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/30/2008 at 9:50:55 AM. Contact: ###-####. south side of bld ok at 1 hr fb/
BLD-Conference7/8/20087/8/20087/8/2008PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/8/2008 at 10:03:07 AM. Contact: ###-####. reviewed si reports roof deck almost complet fire spray preparation in progress.
BLD-Framing/Rough-in6/16/20086/17/20086/17/2008APART
DetailsJim Storey
si on site ok steel erection in progress. revied w/arch as to how rated assemblys termanate at gurits.
BLD-Concrete6/16/20086/16/20086/16/2008PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/16/2008 at 7:50:35 AM. Contact: ###-####.
BLD-Footing4/7/20084/7/20084/7/2008PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/7/2008 at 11:27:40 AM. Contact: ###-####. center pan footting rebar ok/ si on site for concrete testing.
BLD-Conference2/12/20092/20/2009 A 
DetailsGeorge Slane
Conference with Building and Electrical requested. Contact Cornel Larson ###-####.; Phone #: ###-####