BLD-Final | 7/20/2009 | 7/20/2009 | 7/20/2009 | P | PASS |
Jim Storey
|
|
|
Jim-ACHD is ok with us to final so do what you need to do I guess.......Barb bld final ok
|
BLD-Aging Inspection | 6/22/2009 | 6/22/2009 | 6/22/2009 | | PASS |
Jim Storey
|
|
|
passed on 4/13
|
FIRE-Final Inspection | 4/13/2009 | 4/13/2009 | 4/13/2009 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection passed, correction notice items completed.
|
BLD-Final | 4/13/2009 | 4/13/2009 | 4/13/2009 | P | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 2/12/2009 | 2/20/2009 | 2/20/2009 | A | PASS |
Jim Storey
|
|
|
Applicant has requested a joint conference inspection with Electrical at 9:00 a.m. Contact Cornel Larson ###-####; Phone #: ###-####
|
BLD-Aging Inspection | 1/23/2009 | 1/23/2009 | 1/23/2009 | | NR |
Jim Storey
|
|
|
equment instal is still underway and should be certified first part of feb. 09 requist for final will be called in upon completion.
|
Code Occupancy Approval | | | 10/13/2008 | | PASS |
Andrea Tuning
|
|
|
|
BLD-Final | 10/10/2008 | 10/10/2008 | 10/10/2008 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/10/2008 at 7:13:28 AM. Contact: ###-####. temp ok pending others ok for equment set up and production.
|
BLD-Other | 10/7/2008 | 10/7/2008 | 10/7/2008 | A | PASS |
Jim Storey
|
|
|
fire stopping complet in restaroon and at drinking foutian
|
FIRE-Final Inspection | 10/6/2008 | 10/6/2008 | 10/6/2008 | A | PART |
Forrest France
|
|
|
Items needed prior to permit fire life safety final include repair one EM exit discharge light at the main entry, spin the SW hydrant 180 deg. to face the building, provide one fire extinguisher at the cylinder pick/sort area #132 when racking is installed, the spray booth fire sprinkler permit work needs to be completed inspected and approved, noted work at the fuel island is not finished at this time. Recieved signed letter from Musgrove Engineering regarding gas control system functionality per design requirements. Okay to begin equipment installation per agreements on file.
|
FIRE-Alarm Testing | 10/6/2008 | 10/6/2008 | 10/6/2008 | A | DONE |
Forrest France
|
|
|
Duplicate inspection request.
|
BLD-Final | 10/6/2008 | 10/6/2008 | 10/6/2008 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/6/2008 at 7:19:10 AM. Contact: ###-####. fire stopping
|
FIRE-Final Inspection | 9/30/2008 | 10/1/2008 | 10/1/2008 | A | NR |
Forrest France
|
|
|
Need project related fire alarm and sprinkler permit finals prior to building life safety approvals.
|
FIRE-Conference | 9/11/2008 | 9/12/2008 | 9/12/2008 | A | DONE |
Forrest France
|
|
|
Regarding project inspection schedule including related fire alarm and sprinkler permit work.
|
BLD-Conference | 9/11/2008 | 9/12/2008 | 9/12/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/11/2008 at 3:33:34 PM. Contact: ###-####.
|
BLD-Other | 9/3/2008 | 9/3/2008 | 9/3/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/3/2008 at 7:29:58 AM. Contact: ###-####. fire wall ok ceilling ok to drop ceilling office area. one area at mixing rm. extened to roof deck.
|
BLD-Other | 8/29/2008 | 9/2/2008 | 9/2/2008 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/29/2008 at 1:42:04 PM. Contact: ###-####.
|
BLD-Other | 8/28/2008 | 8/28/2008 | 8/28/2008 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/28/2008 at 11:19:18 AM. Contact: ###-####.
|
BLD-Conference | 8/8/2008 | 8/19/2008 | 8/19/2008 | A | PASS |
Jim Storey
|
|
|
9:00 a.m. on site conference meeting with all trades.
|
BLD-Framing/Rough-in | 8/5/2008 | 8/6/2008 | 8/6/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/5/2008 at 2:51:30 PM. Contact: ###-####.interior partions ok for cover.
|
BLD-Framing/Rough-in | 7/31/2008 | 8/1/2008 | 8/1/2008 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/31/2008 at 1:52:57 PM. Contact: ###-####. perpendiculat membrane penatration fire stopping ok for cover.
|
BLD-Framing/Rough-in | 7/30/2008 | 7/30/2008 | 7/30/2008 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/30/2008 at 9:50:55 AM. Contact: ###-####. south side of bld ok at 1 hr fb/
|
BLD-Conference | 7/8/2008 | 7/8/2008 | 7/8/2008 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/8/2008 at 10:03:07 AM. Contact: ###-####. reviewed si reports roof deck almost complet fire spray preparation in progress.
|
BLD-Framing/Rough-in | 6/16/2008 | 6/17/2008 | 6/17/2008 | A | PART |
Jim Storey
|
|
|
si on site ok steel erection in progress. revied w/arch as to how rated assemblys termanate at gurits.
|
BLD-Concrete | 6/16/2008 | 6/16/2008 | 6/16/2008 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/16/2008 at 7:50:35 AM. Contact: ###-####.
|
BLD-Footing | 4/7/2008 | 4/7/2008 | 4/7/2008 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/7/2008 at 11:27:40 AM. Contact: ###-####. center pan footting rebar ok/ si on site for concrete testing.
|
BLD-Conference | 2/12/2009 | 2/20/2009 | | A | |
George Slane
|
|
|
Conference with Building and Electrical requested. Contact Cornel Larson ###-####.; Phone #: ###-####
|