FIRE-Final Inspection | 7/14/2008 | 7/15/2008 | 7/15/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Per Al Caine, with the state of idaho elevator division, they do not require our sign off. This elevator and the associated monitoring system has been inspected and passed by the state elevator inspector and has not been inspected by the city of boise.
|
DOC - Permit Finaled | | | 7/15/2008 | | DONE |
Jim Storey
|
|
|
All signatures recieved letter of compliance issued
|
BLD-Framing/Rough-in | 1/30/2008 | 1/31/2008 | 1/31/2008 | A | PASS |
Mike Jordan
|
|
|
russell Phone #: ###-####. framing for elevator shaft only. Also reviewed additional truss engineering for roof truss modifications. ok.
|
BLD-Foundation | 1/10/2008 | 1/10/2008 | 1/10/2008 | P | PASS |
Mike Jordan
|
|
|
russell Note: want to pour about 2:00 Phone #: ###-####
|
BLD-Footing | 1/7/2008 | 1/8/2008 | 1/8/2008 | A | PASS |
Jim Storey
|
|
|
Russell; Phone #: ###-####Note: hoping to pour by concrete my 9:00 am Internet Inspection Request from: Cathy Weisshaupt
|