BLD-Final | 6/6/2008 | 6/6/2008 | 6/10/2008 | P | CANC |
Jim Storey
|
|
|
Kil Phone #: ###-####
|
BLD-Final | 6/9/2008 | 6/9/2008 | 6/9/2008 | P | PART |
Jim Storey
|
|
|
Keil Phone #: ###-#### final ok pending p&z sign off.
|
FIRE-Final Inspection | 6/9/2008 | 6/9/2008 | 6/9/2008 | P | PASS |
Troy Cobbley
|
|
|
fire life saftey passed
|
Code Occupancy Approval | 6/6/2008 | 6/6/2008 | 6/9/2008 | P | PASS |
Carol Montgomery
|
|
|
Temporary signed. Still need to provide arbs at the rear property line. 5' at planting - 1 every 15'. The arb's were determined not to be required by Matt Halisty and Sarah Schafer. Pass.
|
FIRE-Final Inspection | 6/6/2008 | 6/6/2008 | 6/6/2008 | P | PART |
Forrest France
|
|
|
Still need site work complete at both entrances-paving is not finished-need to comply with fire department access requirements-see fire code review notes for specific details.
|
FIRE-Final Inspection | 5/30/2008 | 6/2/2008 | 6/2/2008 | P | CANC |
Troy Cobbley
|
|
|
Paving was not complete which affected the fire dept access. Inspection to be rescheduled for wednesday.
|
BLD-Framing/Rough-in | 5/30/2008 | 5/30/2008 | 5/30/2008 | P | PASS |
Jim Storey
|
|
|
keil Phone #: ###-#### letter from engineer on file.
|
FIRE-Final Inspection | 5/30/2008 | 5/30/2008 | 5/30/2008 | P | CANC |
Forrest France
|
|
|
keil - fire life safety Phone #: ###-#### Overbooked
|
BLD-Energy code compliance | 5/20/2008 | 5/20/2008 | 5/20/2008 | P | PART |
Mike Jordan
|
|
|
keal Phone #: ###-####Still Need paperwork from engineer on hold down issues. Also need submital for flame spread on exposed facing for insul. Contractor noted that enginner has given a verbal ok on changes and is waiting for letter. Gave ok to cover exterior walls only. Items for restrooms not completed and still needs plumbing ri.
|
BLD-Framing/Rough-in | 5/16/2008 | 5/16/2008 | 5/16/2008 | P | PART |
Jim Storey
|
|
|
keil Phone #: ###-#### ok to insulate/ pending letter from engineer of record as to justifacation of design to meet chapter 16 for lack of special insp for epoxy bolts replacment of simpson holddowns for wall bracing design. vapor barrior must meet smoke/flame spread where exposed.
|
BLD-Framing/Rough-in | 4/25/2008 | 4/28/2008 | 4/28/2008 | A | NR |
Jim Storey
|
|
|
keil Phone #: ###-####
|
BLD-Framing/Rough-in | 4/17/2008 | 4/18/2008 | 4/18/2008 | A | NR |
Jim Storey
|
|
|
keil Phone #: ###-#### need truss engineering.
|
BLD-Framing/Rough-in | 4/10/2008 | 4/11/2008 | 4/11/2008 | A | PART |
Jim Storey
|
|
|
Keil, shear nail; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt exteror nailling ok
|
BLD-Framing/Rough-in | 4/7/2008 | 4/7/2008 | 4/7/2008 | P | PART |
Jim Storey
|
|
|
keil - partial Phone #: ###-#### colums in front post atchment ok to cover/ center colums grouted ok to cover. roof nailling ok for cover.
|
Extend Permit 180 days | 4/7/2008 | 4/7/2008 | 4/7/2008 | A | PASS |
Jim Storey
|
|
|
colums in front post atchment ok to cover/ center colums grouted ok to cover.
|
BLD-Framing/Rough-in | 4/2/2008 | 4/3/2008 | 4/3/2008 | A | PART |
Tom Arcoraci
|
|
|
kile Note: shear Phone #: ###-#### ok at columns only
|
BLD-Conference | 3/26/2008 | 3/27/2008 | 3/27/2008 | A | PASS |
Jim Storey
|
|
|
keil Phone #: ###-####
|
BLD-Conference | 3/11/2008 | 3/12/2008 | 3/12/2008 | A | PASS |
Jim Storey
|
|
|
keil Phone #: ###-####
|
BLD-Other | 3/6/2008 | 3/7/2008 | 3/7/2008 | A | PASS |
Jim Storey
|
|
|
KEIL NOTE: STEM WALL Phone #: ###-####
|
BLD-Footing | 3/3/2008 | 3/4/2008 | 3/4/2008 | A | PASS |
Jim Storey
|
|
|
kyle Phone #: ###-####
|