BLD-Final | 4/24/2008 | 4/25/2008 | 4/25/2008 | A | PASS |
Mike Jordan
|
|
|
brandon Phone #: ###-####
|
DOC - Permit Finaled | 4/25/2008 | 4/25/2008 | 4/25/2008 | P | PASS |
Mike Jordan
|
|
|
Cert of occ. issued. All issues resolved.
|
BLD-Final | 4/23/2008 | 4/24/2008 | 4/24/2008 | A | FAIL |
Mike Jordan
|
|
|
brandon Phone #: ###-####. Provide address numbers on house. Complete fine grading. Provide and post insulation cert. Complete firecaulking on penetrations in garage. c/n posted.
|
BLD-Energy code compliance | 2/15/2008 | 2/15/2008 | 2/15/2008 | P | PASS |
Mike Jordan
|
|
|
brandon Phone #: ###-####
|
BLD-Energy code compliance | 2/13/2008 | 2/14/2008 | 2/14/2008 | P | NR |
Mike Jordan
|
|
|
brandon Phone #: ###-####
|
BLD-Framing/Rough-in | 2/12/2008 | 2/13/2008 | 2/13/2008 | P | PASS |
Mike Jordan
|
|
|
brandon Phone #: ###-####. All framing issues have been corrected. Will check glazing at stairway on final insp.
|
BLD-Framing/Rough-in | 2/11/2008 | 2/12/2008 | 2/12/2008 | A | FAIL |
Mike Jordan
|
|
|
Brandon Phone #: ###-####. Strap all top and bottom plates at gas pipe penetrations and at plumbing pentration at future warter softner. Provide header at doorway bonus room at T22 truss bearing. Tempered glazing required at window at landing. Provide fireblocking on furout 2x4 wall above 2x6 wall at ceiling level. (southwall). Provide additional bracing on gable truss on southwest wall by main entry. ok to insul. after mech. ri insp has passed. c/n posted on site.
|
BLD-Framing/Rough-in | 2/8/2008 | 2/11/2008 | 2/11/2008 | P | CANC |
Mike Jordan
|
|
|
Brandon Phone #: ###-####
|
BLD-Footing | 1/14/2008 | 1/14/2008 | 1/14/2008 | P | PART |
Mike Jordan
|
|
|
eliza - Note: pour concrete noon Phone #: ###-####. Approved plans on site. set backs ok. wip on stemwall.
|
BLD-Footing | 1/11/2008 | 1/11/2008 | 1/11/2008 | P | PART |
Mike Jordan
|
|
|
brandon Phone #: ###-####. no approved plans on site. inspected footings as per supplied plans. Noted to contractor that he procceds at his own risk. Will need approved plans on stemwall. If any changes are noted, contractor will repair.
|