BLD-Final | 10/29/2008 | 10/29/2008 | 10/29/2008 | P | PASS |
Jim Storey
|
|
|
JR Phone #: ###-####
|
BLD-Final | 10/27/2008 | 10/27/2008 | 10/27/2008 | P | PART |
Jim Storey
|
|
|
JR Phone #: ###-#### need letter to bo to address pharmcy exit hardware/ si close out doc.
|
FIRE-Final Inspection | 10/27/2008 | 10/27/2008 | 10/27/2008 | A | PASS |
Forrest France
|
|
|
C/N items verified for compliance, contractor to provide approved door hardware at the pharmacy area exit prior to structural final inspection.
|
FIRE-Final Inspection | 10/22/2008 | 10/23/2008 | 10/23/2008 | A | FAIL |
Troy Cobbley
|
|
|
Provide approved hardware on the pharmacy door and the from entrance doors. Provide fire dept. signage as per note #6 and repair the supervisory alarm on the fire alarm system.
|
FIRE-Conference | 10/20/2008 | 10/20/2008 | 10/20/2008 | P | DONE |
Forrest France
|
|
|
Site visit regarding fire sprinkler coverage at the outside attatched and covered storage area.
|
BLD-Framing/Rough-in | 9/17/2008 | 9/18/2008 | 9/18/2008 | P | PART |
Dave Hannah
|
|
|
J.R- ceiling cover Phone #: ###-####needs to wire up mec fixtures ok to start laying in edge tiles
|
BLD-Framing/Rough-in | 8/5/2008 | 8/6/2008 | 8/6/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/5/2008 at 5:10:58 PM. Contact: ###-####. interior walls ok for cover.
|
BLD-Framing/Rough-in | 7/25/2008 | 7/28/2008 | 7/28/2008 | A | PASS |
Jim Storey
|
|
|
JR Phone #: ###-#### shell framing ok interior framing ok pending trade ri.
|
BLD-Aging Inspection | 7/16/2008 | 7/16/2008 | 7/17/2008 | | NR |
Jim Storey
|
|
|
|
BLD-Foundation | 4/30/2008 | 5/1/2008 | 5/5/2008 | P | PASS |
Jim Storey
|
|
|
j.r. - stem wall Phone #: ###-####
|
BLD-Foundation | 4/30/2008 | 4/30/2008 | 4/30/2008 | P | PART |
Jim Storey
|
|
|
j.r. - stem wall Phone #: ###-#### ok s\ e 1/2 of building
|
BLD-Footing | 4/21/2008 | 4/21/2008 | 4/21/2008 | P | PART |
Tony Young
|
|
|
jr Note:pouring concrete 3:30 Phone #: ###-#### footings ok pending S.I. report
|