BLD-Final | 10/30/2008 | 10/31/2008 | 10/31/2008 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/30/2008 at 4:12:50 PM. Contact: ###-####. Landscape bonded....OK for Perm Occ.
|
BLD-Final | 10/29/2008 | 10/30/2008 | 10/30/2008 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/29/2008 at 4:35:32 PM. Contact: ###-####. Provide 1hr protection at ceiling duct ....Med gas room.
|
BLD-Final | 10/29/2008 | 10/29/2008 | 10/29/2008 | P | NR |
Jim Sly
|
|
|
John ###-####
|
FIRE-Final Inspection | 10/28/2008 | 10/29/2008 | 10/29/2008 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 10/27/2008 | 10/28/2008 | 10/28/2008 | P | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for the deficiencies which have been listed on the review comments.
|
FIRE-Conference | 10/27/2008 | 10/27/2008 | 10/27/2008 | P | DONE |
Troy Cobbley
|
|
|
I discussed the installation requirements for duct smoke detectors.
|
BLD-Other | 10/2/2008 | 10/2/2008 | 10/2/2008 | P | DONE |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/2/2008 at 10:13:26 AM. Contact: ###-####. Grid ok
|
BLD-Energy code compliance | 7/7/2008 | 7/7/2008 | 7/7/2008 | P | PEND |
Mike Jordan
|
|
|
ivey Phone #: ###-####
|
BLD-Framing/Rough-in | 7/2/2008 | 7/2/2008 | 7/2/2008 | P | PASS |
Jim Sly
|
|
|
John- wall Phone #: ###-#### Frame and shear OK
|
BLD-Footing | 5/19/2008 | 5/20/2008 | 5/20/2008 | A | PART |
Jim Sly
|
|
|
russ-and colum inspection please Phone #: ###-#### Column pads at entry OK....columns OK.
|
BLD-Conference | 4/1/2008 | 4/2/2008 | 4/2/2008 | A | CANC |
Jim Sly
|
|
|
Russ ###-####
|
BLD-Foundation | 3/20/2008 | 3/21/2008 | 3/21/2008 | A | PASS |
Jim Sly
|
|
|
russ Phone #: ###-####
|
BLD-Footing | 3/7/2008 | 3/7/2008 | 3/7/2008 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/7/2008 at 10:38:00 AM. Contact: ###-####.
|