Permit Information
Permit NumberBLD07-03247
StatusFinaled
Name SBI CONTRACTING INC
Site Address 11760 W EXECUTIVE DR Unit: 140
Project NameEXECUTIVE CENTER
Customer Number 
ePlanReviewNo
Description
(SBI CONTRACTING - EXECUTIVE CENTER - STE 140) Remodel project work to consist of seperating out a New 1,938 sq.ft. accessory office space from a 10,500 sq.ft. warehouse space located in a 16,500 existing warehouse building. Remodel work to include all interior work: some new interior walls, interior finish, new restroom, new accessible drinking fountain, new grid ceiling with lights, emergency lighting, new service sink, new fire extinguisher, door, mechanical work, and electrical work. A new Certificate of Occupancy with the new occupant load total is to be issued when completed and approved. This building was originally constructed in Ada County and later annexed into Boise City. Existing envelope is not being affected by this permit. NOTE: This building is fully fire sprinklered for area increase. (SRZ)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/20/20085/21/20085/21/2008APASS
DetailsMike Jordan
steve Phone #: ###-####. ok for perm occ.
FIRE-Final Inspection5/14/20085/15/20085/15/2008APASS
DetailsTroy Cobbley
Life safety passed.
BLD-Final2/22/20082/25/20082/25/2008APART
DetailsMike Jordan
mark Phone #: ###-####. Temp occ. granted. Grid ceiling is repaired. Will be ok for perm occ once life/safety perms and racking requirements are take care of.
BLD-Conference2/19/20082/19/20082/19/2008PPASS
DetailsMike Jordan
mark or steve Phone #: ###-#### or ###-####. Interior partition walls only one sided, framing ok. Needs to remove screws from clips in grid ceiling.
BLD-Final2/15/20082/15/20082/15/2008PNR
DetailsMike Jordan
Spoke with Mark of SBI contracting regarding bldg. final. Needs plumbing and elec, to final or temp as well. No framing inspections have been done on this job. Interior walls and ceiling grid have been built. Walls are covered. Noted to Mark with SBI contractors to call in for bldg. conferance on Tuesday AM. and will go over work to date and see what needs to be done. Also explained above situation to architect and noted to him that I would not give a TEmp. occ until other trades have temp or final and what additional work might be required since no framing insp. have taken place. Will contact the bldg. official (G. Slane) prior to proceeding on Tuesday morning.
BLD-Final2/14/20082/15/20082/15/2008ACANC
DetailsMike Jordan
Steve, late p.m. please; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
FIRE-Final Inspection2/14/20082/15/20082/15/2008APART
DetailsTroy Cobbley
A temporary occupancy was given with sam rogers and dave hannimans permission until the racking permit has been taken care of. During the TOC period no product will be allowed to be stored on the racks.
FIRE-Final Inspection2/12/20082/13/20082/13/2008AFAIL
DetailsTroy Cobbley
Repair exit signs in the warehouse. Provide approved hardware on the office doors. Provide fire extinguisher in the warehouse per review note #3. Comply with note #32 of the plan review comments for storage. Currently the steel racks are 10'-0" in height with the top of storage at 16'-0". The existing sprinkler riser does not state what class of commodity or heighth of storage it was designed for. But is did state that the denisty was .295 gpm over 2,600 square feet. steve Phone #: ###-####