BLD-Final | 1/14/2009 | 1/15/2009 | 1/15/2009 | P | PASS |
Mike Jordan
|
|
|
chad Phone #: ###-####
|
DOC - Permit Finaled | 1/15/2009 | 1/15/2009 | 1/15/2009 | P | PASS |
Mike Jordan
|
|
|
Letter of compliance was issued.
|
BLD-Final | 1/9/2009 | 1/12/2009 | 1/14/2009 | A | NR |
Mike Jordan
|
|
|
|
BLD-Final | 1/9/2009 | 1/9/2009 | 1/9/2009 | P | FAIL |
Mike Jordan
|
|
|
chadd Phone #: ###-#### Note: please call 1/2 hr prior to inspection . Needs zoning final and to resolve the exp. mech. permit issue. Also needs to get fire final on racking permit done prior to this permit being finaled. Needs to provide smoke index and flame spread data for foam insul in new walk in cooler.
|
FIRE-Final Inspection | 1/8/2009 | 1/9/2009 | 1/9/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 1/6/2009 | 1/7/2009 | 1/7/2009 | A | FAIL |
Troy Cobbley
|
|
|
Need the project related fire alarm permit finaled. Also need the exit discharge lights installed at both main exits and the exit sign, corridor emergency light and exit discharge light repaired at/in the north exit corridor at the meat department. The west exterior exit door out of the flower service area needs the large metal bar/deadbolt/padlock removed.
|
FIRE-Final Inspection | 12/30/2008 | 12/31/2008 | 12/30/2008 | A | CANC |
Troy Cobbley
|
|
|
chad Phone #: ###-#### Inspection cancelled from web by: Patricia Smith
|
FIRE-Final Inspection | 8/11/2008 | 8/12/2008 | 8/12/2008 | A | PART |
Troy Cobbley
|
|
|
The Pizza area is ok to occupy. Todays inspection was for this area only.
|
BLD-Final | 8/10/2008 | 8/11/2008 | 8/11/2008 | A | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/10/2008 at 10:20:22 PM.
|
BLD-Framing/Rough-in | 7/8/2008 | 7/8/2008 | 7/8/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/8/2008 at 2:04:31 AM. screws removed from top track of soffitt at seafood area and supported from structure. ok to cover.
|
BLD-Framing/Rough-in | 7/7/2008 | 7/7/2008 | 7/7/2008 | P | FAIL |
Mike Jordan
|
|
|
Soffitt at seafood area. needs to support top track from structure.
|
BLD-Framing/Rough-in | 6/11/2008 | 6/11/2008 | 6/11/2008 | P | PASS |
Mike Jordan
|
|
|
r & o Phone #: ###-####. Interior framed steel stud walls for coinstar machine and cigarrette sales.
|
BLD-Framing/Rough-in | 6/5/2008 | 6/5/2008 | 6/5/2008 | P | PASS |
Mike Jordan
|
|
|
Charlie Phone #: ###-####furout walls in new pizzaria and soffitt at pharmacy.
|
BLD-Framing/Rough-in | 6/4/2008 | 6/5/2008 | 6/5/2008 | A | NR |
Mike Jordan
|
|
|
bob\\this is for a soffit inspection Phone #: ###-####. no one on jobsite, trailer locked. Noted to bob on phone that he would have to reschedule for this afternoon or when someone would be here.
|
BLD-Framing/Rough-in | 5/12/2008 | 5/13/2008 | 5/13/2008 | A | PART |
Jim Storey
|
|
|
dan Phone #: ###-#### angled wall and two sides of box next to delli ok to cover noted area on aproved plan. need to verify what is to be done on the other permits listed per the up-grade agreement. not clear on the plan that I could identify at this time. contractor to contact arch.
|
BLD-Framing/Rough-in | 5/12/2008 | 5/12/2008 | 5/12/2008 | P | CANC |
Mike Jordan
|
|
|
dan Phone #: ###-####
|