BLD-Final | 6/10/2008 | 6/10/2008 | 6/10/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/10/2008 at 5:30:31 AM. Contact: ###-####.
|
FIRE-Final Inspection | 6/10/2008 | 6/10/2008 | 6/10/2008 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed, HVAC unit duct detectors tested okay.
|
FIRE-Final Inspection | 6/9/2008 | 6/9/2008 | 6/9/2008 | P | CANC |
Troy Cobbley
|
|
|
Per Pat this is to be rescheduled for tomorrow after the duct smoke detectors have been pretested.
|
BLD-Final | 6/9/2008 | 6/9/2008 | 6/9/2008 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/9/2008 at 6:22:54 AM. Contact: ###-####.
|
BLD-Final | 6/6/2008 | 6/6/2008 | 6/6/2008 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/6/2008 at 6:54:05 AM. Contact: ###-####.
|
FIRE-Final Inspection | 6/6/2008 | 6/6/2008 | 6/6/2008 | P | CANC |
Forrest France
|
|
|
Scheduled by a contractor via Hello! on 6/6/2008 at 6:53:19 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/29/2008 | 5/30/2008 | 5/30/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/28/2008 at 4:41:54 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/28/2008 | 5/29/2008 | 5/29/2008 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/28/2008 at 4:44:58 PM. Contact: ###-####. out of time rolled over.
|
BLD-Framing/Rough-in | 5/21/2008 | 5/22/2008 | 5/22/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/21/2008 at 4:52:52 PM. Contact: ###-####.ceilling and draftstop ok.
|
FIRE-Conference | 5/19/2008 | 5/19/2008 | 5/19/2008 | P | DONE |
Troy Cobbley
|
|
|
I discussed the placement of two exit signs as shown on the approved plans in the first floor corridor at the east end with the electrical contractor.
|
BLD-Framing/Rough-in | 4/2/2008 | 4/3/2008 | 4/3/2008 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/2/2008 at 4:36:35 PM. Contact: ###-####. walls ok/ fire stopping at office soffit required.
|