Permit Information
Permit NumberBLD08-00130
StatusFinaled
Name THE CHRISTENSEN CORPORATION
Site Address 950 W BANNOCK ST Unit: 1050
Project NameClearwater Advisors Expansion
Customer Number 
ePlanReviewNo
Description
(Clearwater Advisors Expansion) Add open office, offices, Conferance room,new restroom. Ext 1hr corridor and install 3 20 min doors. This(10,922 square feet) office tenant space on the 10th story of a high-rise building. Work is to include interior Nordwall demountable nonbearing partitions, interior doors, sidelights, millwork, and finishes. The access floor system and the suspended ceilings were installed under permit BLD05-02939. The shell and core, including the core restrooms, were constructed under permit BLD04-02348. The work is required to comply with the approved drawings, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/15/20087/16/20087/16/2008APASS
DetailsDave Hannah
tucker Phone #: ###-#### ok for perm occ
FIRE-Final Inspection6/19/20086/19/20086/20/2008PPASS
DetailsForrest France
Fire life safety inspection completed satisfactory, inspection passed.
BLD-Final6/19/20086/20/20086/20/2008APART
DetailsDave Hannah
tucker Phone #: ###-#### ok for temp occ needs to fix ada restroom and change swing on lobby doors
BLD-Conference4/14/20084/15/20084/15/2008APASS
DetailsDave Hannah
tucker Phone #: ###-####
BLD-Framing/Rough-in4/11/20084/11/20084/11/2008PPART
DetailsDave Hannah
mario Phone #: ###-####
BLD-Other3/24/20083/25/20083/25/2008APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/24/2008 at 8:59:34 PM. Contact: ###-####. ceiling grid needs clips or spreader bars around new area
BLD-Framing/Rough-in2/27/20082/27/20082/27/2008PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/27/2008 at 8:57:08 AM. Contact: ###-####. cooidor ext on north side ok to cover
BLD-Framing/Rough-in2/19/20082/19/20082/19/2008PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/19/2008 at 8:46:23 AM. Contact: ###-####.south side restroom and corridor wall ok to cover