BLD-Final | 12/28/2009 | 12/28/2009 | 12/28/2009 | P | PASS |
Tony Young
|
|
|
Clayton Phone #: ###-####
|
DOC - Permit Finaled | 12/28/2009 | 12/28/2009 | 12/28/2009 | P | PASS |
Tony Young
|
|
|
c of c/o issued
|
BLD-Final | 12/17/2009 | 12/17/2009 | 12/17/2009 | P | FAIL |
Tony Young
|
|
|
Clayton Phone #: ###-#### need handrails to meet code
|
BLD-Final | 11/16/2009 | 11/17/2009 | 11/17/2009 | P | PART |
Tony Young
|
|
|
Clayton Phone #: ###-#### conf walk through only
|
FIRE-Final Inspection | 11/9/2009 | 11/10/2009 | 11/10/2009 | A | PASS |
Forrest France
|
|
|
Fire life safety site inspection passed.
|
FIRE-Conference | 11/9/2009 | 11/9/2009 | 11/9/2009 | P | DONE |
Forrest France
|
|
|
Regarding project related fire code review notes and provisions for fire life safety.
|
FIRE-Conference | 10/29/2008 | 10/29/2008 | 10/29/2008 | A | DONE |
Forrest France
|
|
|
Regarding project schedule.
|
BLD-Conference | 7/16/2008 | 7/16/2008 | 7/16/2008 | P | PASS |
Tony Young
|
|
|
Mark Phone #: ###-#### 1st layer of rock ok
|
BLD-Energy code compliance | 6/26/2008 | 6/27/2008 | 6/27/2008 | P | PASS |
Tony Young
|
|
|
Justina- call access Phone #: ###-####
|
BLD-Framing/Rough-in | 6/23/2008 | 6/25/2008 | 6/25/2008 | A | PASS |
Tony Young
|
|
|
justina Phone #: ###-####
|
BLD-Conference | 6/23/2008 | 6/23/2008 | 6/23/2008 | P | PASS |
Tony Young
|
|
|
justina Phone #: ###-#### w/ sheetrocker,, ?s
|
BLD-Conference | 6/2/2008 | 6/3/2008 | 6/3/2008 | A | PASS |
Tony Young
|
|
|
Doug Cooper ###-####//REQUEST 10 AM and would like both Tony Young and Dave Hannah to be there. I gave Doug both inspectors cell#'s to make arrangements. met w/316, contractor also
|
BLD-Conference | 6/2/2008 | 6/3/2008 | 6/3/2008 | A | DONE |
Jim Sly
|
|
|
Meet Tony @.....job site.....Arch and Justina.....
|
BLD-Conference | 5/23/2008 | 5/23/2008 | 5/23/2008 | P | DONE |
Jim Sly
|
|
|
justina - please call prior so she can meet you there Phone #: ###-#### Met with Justina...who is taking over this job.....We have no plans to look at, but went over the basics on a bldg like this.....ie units are separated by 1hr wall and floor/ceiling assemblies (listings provided by architect) and firestopping of all penitrations....
|
BLD-Conference | 5/12/2008 | 5/12/2008 | 5/12/2008 | P | PART |
Tony Young
|
|
|
chris Phone #: ###-####,, meet at 2pm conf on 1 hr,,owner and his architect may need to meet plan reviewer for changes
|
BLD-Conference | 5/9/2008 | 5/12/2008 | 5/12/2008 | A | CANC |
Tony Young
|
|
|
chris Phone #: ###-#### meet at 2pm
|
BLD-Conference | 5/8/2008 | 5/9/2008 | 5/9/2008 | A | NR |
Tom Arcoraci
|
|
|
chris Phone #: ###-####
|
BLD-Conference | 5/8/2008 | 5/9/2008 | 5/9/2008 | A | NR |
Tom Arcoraci
|
|
|
Dixie will call you for a time.
|
BLD-Foundation | 3/28/2008 | 3/28/2008 | 3/28/2008 | P | PART |
Tony Young
|
|
|
crhis Phone #: ###-#### stem walls
|
BLD-Footing | 3/26/2008 | 3/27/2008 | 3/27/2008 | A | PART |
Tony Young
|
|
|
chris Phone #: ###-#### ext. ftgs for porch, and infill
|
BLD-Conference | 3/25/2008 | 3/26/2008 | 3/26/2008 | A | PASS |
Tony Young
|
|
|
Chris; Phone #: ###-#### ,, landing?s met w/ plan reviewer on these issues, interior of units you can use res code limits,,
|
BLD-Foundation | 3/24/2008 | 3/25/2008 | 3/25/2008 | A | PART |
Tony Young
|
|
|
Chris; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt INTERIOR BASEMENT FTGS OK,, extensive general conf on other
|