BLD-Final | 9/16/2008 | 9/16/2008 | 9/17/2008 | P | PASS |
Dave Hannah
|
|
|
jay Phone #: ###-####
|
DOC - Permit Finaled | 9/17/2008 | 9/17/2008 | 9/17/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 7/28/2008 | 7/29/2008 | 7/29/2008 | A | FAIL |
Jim Sly
|
|
|
jay Phone #: ###-#### Checked draftstops in 2 areas.......Many holes etc.
|
FIRE-Final Inspection | 7/21/2008 | 7/22/2008 | 7/23/2008 | A | PASS |
Forrest France
|
|
|
Noted corrections are complete, fire life safety passed.
|
FIRE-Final Inspection | 6/30/2008 | 7/1/2008 | 7/1/2008 | A | FAIL |
Forrest France
|
|
|
Missing ceiling tile at several locations, need to repair one exit sign, one PFE is overdue annual certification at the server room, need to verify door mag locks drop out on fire alarm and power loss, not all items reviewed at this time, discussed subsequent permits for future remodel work.
|
FIRE-Final Inspection | 6/25/2008 | 6/26/2008 | 6/26/2008 | A | FAIL |
Forrest France
|
|
|
The project related fire alarm permit is not in the "issued" status-plans need to be picked up, permit paid and work completed prior to field inspection request and finished previous to building life safety inspection and final approval. Notified contractor of the situation.
|
BLD-Final | 6/24/2008 | 6/25/2008 | 6/25/2008 | A | NR |
Dave Hannah
|
|
|
jay Phone #: ###-#### needs other trades to final
|
BLD-Framing/Rough-in | 5/30/2008 | 6/3/2008 | 6/3/2008 | A | PART |
Dave Hannah
|
|
|
jay - ceiling cover Phone #: ###-####ok to cover need to check draft stops
|
BLD-Framing/Rough-in | 4/25/2008 | 4/28/2008 | 4/28/2008 | A | PASS |
Dave Hannah
|
|
|
jay Phone #: ###-#### ok to cover int walls
|
BLD-Framing/Rough-in | 4/17/2008 | 4/21/2008 | 4/21/2008 | P | PART |
Dave Hannah
|
|
|
jay Phone #: ###-#### ok to one side walls
|