BLD-Final | 11/12/2008 | 11/13/2008 | 11/13/2008 | A | PASS |
Tony Young
|
|
|
Kathy Phone #: ###-#### Note: documents are in the garage if not code call kathy
|
DOC - Permit Finaled | 11/13/2008 | 11/13/2008 | 11/13/2008 | P | PASS |
Tony Young
|
|
|
signed paperwork
|
BLD-Final | 8/22/2008 | 8/25/2008 | 8/25/2008 | A | NR |
Tony Young
|
|
|
Kathy Phone #: ###-#### need all engineering per scope of work
|
BLD-Conference | 4/7/2008 | 4/7/2008 | 4/7/2008 | P | PEND |
Tony Young
|
|
|
Tony please call me regarding this permit. Thanks Rita ###-#### placed a SWO on job for permit fees owed per office
|
BLD-Energy code compliance | 4/3/2008 | 4/4/2008 | 4/4/2008 | A | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 4/2/2008 | 4/3/2008 | 4/3/2008 | P | PASS |
Tony Young
|
|
|
JUSTIN Phone #: ###-####
|
BLD-Framing/Rough-in | 4/2/2008 | 4/2/2008 | 4/2/2008 | P | NR |
Jim Sly
|
|
|
justin Phone #: ###-#### Need Plumb and Mech rough-ins approved.
|
BLD-Framing/Rough-in | 3/31/2008 | 4/1/2008 | 4/1/2008 | A | FAIL |
Tony Young
|
|
|
justin Phone #: ###-#### c/n posted,, need a mech permit and r/in,, need elec. and plumbing r/in also,, on site conf.. will need struct. eng. letter for work done w/out permits or inspections
|
BLD-Conference | 3/4/2008 | 3/4/2008 | 3/4/2008 | P | FAIL |
Tony Young
|
|
|
per tony young - doing work without a permit need to double fee,, concrete has been poured,, framed, sided, etc.. will need a letter of ok as built from structural engineer on ftgs and soils
|