Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD08-00224
StatusFinaled
Name INTERMOUNTAIN PROPERTY DEVELOPMENT
Site Address 3896 N WOODY LN
Project Name 
Customer Number 
ePlanReviewNo
Description
(live/work unit 25) To construct a 2,000 sq.ft., two story, Live/Work unit (Townhouse) on a zero lot line. The First story includes a 756 sq.ft. non-residential use, operated by the tenant and shall comply with section 419 of the 2007 International Building Code Supplement. The first story also has a 36 sq.ft. covered porch, a 89 sq.ft. covered patio, and a 464 sq.ft. attached two car garage. A maximum of five non-residential workers or employees are allowed to occupy the non-residential area at any one time. The second story includes a 1,244 sq.ft., two bedroom, two bathroom, dwelling unit with a 89 sq.ft. balcony. The dwelling unit shall comply with the 2006 International Residential Code for a Single family townhouse dwelling. This building shall conform to section 903.3.1.3 of the 2006 IBC. An automatic sprinkler system shall be installed throughout in accordance with NFPA 13D. Any and all NFPA 13D systems shall be equipped with an alarm initiating device commonly referred to as a flow switch, and an outside alarm indicating device. A Fire Sprinkler Permit is required prior to beginning any fire sprinkler work. "This lot is within a Floodplain area. An elevation certificate is required to be submitted to and approved by Jim Wyllie, Public Works Department, prior to calling for a framing inspection." All work per the approved plans, engineering, plan review report, and alternate agreements on file. DRH07-00466, DRH08-00126, and CUP07-00121 per Planning and Zoning. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection2/18/20102/18/20102/25/2010 PASS
DetailsTony Young
DOC - Permit Finaled2/25/20102/25/20102/25/2010APASS
DetailsTony Young
BLD-Final5/20/20095/22/20095/22/2009APASS
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
BLD-Final5/20/20095/20/20095/20/2009PPART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
conf on final,, need fire caulking in garage area,, need zoning final
FIRE-Final Inspection5/20/20095/20/20095/20/2009PPASS
DetailsTroy Cobbley
Life safety passed. The fire alarm system as shown on the approved drawings has not been installed but it is not required either as per the project scope of work. This was discussed with Scott Arlenno.
BLD-Final4/30/20095/1/20094/30/2009ACANC
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Jessica Noland Inspection cancelled from web by: Jessica Noland
BLD-Other4/21/20094/21/20094/21/2009PPASS
DetailsTony Young
ceiling grid inspection Phone #: ###-#### Internet Inspection Request from: Jessica Noland
BLD-Conference3/31/20093/31/20093/31/2009PPASS
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
BLD-Conference3/30/20093/31/20093/31/2009APASS
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
ducts from garage to office ok,, 26 gauge,, fire caulk around per code
BLD-Conference3/30/20093/30/20093/30/2009PPEND
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
need to review firewall ?s w// plan review
BLD-Energy code compliance3/10/20093/11/20093/11/2009APASS
DetailsTony Young
Phone #: ###-####
BLD-Framing/Rough-in3/5/20093/6/20093/6/2009PPART
DetailsJim Sly
need ok to insulate and cover Phone #: ###-#### Internet Inspection Request from: Jessica Noland
C/N Repair 5/8 rock removed to allow for continuious roof vent at ridge. Call for insp of 5/8 rock membrane on E. 1hr wall. OK to Insulate.
BLD-Framing/Rough-in3/4/20093/5/20093/5/2009ANR
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
Need to post address.....Need Plm R/I approved....Need approved plans ..... Talked to Bldr.....
BLD-Framing/Rough-in2/25/20092/25/20092/25/2009PNR
DetailsTony Young
Dan Phone #: ###-####
need trades 1st
FIRE-Conference2/18/20092/19/20092/20/2009ADONE
DetailsTroy Cobbley
This was for a conference covering the sprinkler monitoring. It also included flushing the underground sprinkler supply
BLD-Framing/Rough-in1/14/20091/15/20091/15/2009ACANC
DetailsTony Young
dan Phone #: ###-#### needs eval sheet from Jim Wylie PW first
BLD-Framing/Rough-in12/30/200812/31/200812/31/2008APASS
DetailsTony Young
fire wall inspection Phone #: ###-#### Internet Inspection Request from: Jessica Noland
firewall ok in between
BLD-Concrete10/9/200810/10/200810/10/2008APART
DetailsTony Young
rebar inspection
pour concrete AM Phone #: ###-#### Internet Inspection Request from: Jessica Noland
rock placement in courtyard,, concrete under rocks
BLD-Concrete9/26/20089/29/20089/29/2008PPASS
DetailsTony Young
rebar inspection Phone #: ###-#### Internet Inspection Request from: Jessica Noland
footings ok,, corners surveyed in