BLD-Final | 5/26/2009 | 5/28/2009 | 5/28/2009 | A | PASS |
Tom Arcoraci
|
|
|
Jan Phone #: ###-#### ok for perm occ
|
BLD-Aging Inspection | 5/20/2009 | 5/20/2009 | 5/20/2009 | | DEFR |
Tom Arcoraci
|
|
|
zoning issue
|
BLD-Conference | 3/18/2009 | 3/18/2009 | 3/18/2009 | A | PASS |
Tom Arcoraci
|
|
|
on temp
|
BLD-Aging Inspection | 3/18/2009 | 3/18/2009 | 3/18/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 1/15/2009 | 1/16/2009 | 1/16/2009 | A | PART |
Tom Arcoraci
|
|
|
jan Note: late morning please Phone #: ###-#### pending zoning sign off
|
FIRE-Final Inspection | 1/15/2009 | 1/16/2009 | 1/16/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 1/13/2009 | 1/14/2009 | 1/14/2009 | A | FAIL |
Troy Cobbley
|
|
|
Need the project related fire alarm permit finaled. Need approved hardware installed on the pocket doors, approved hardware on the south exit door and the east exit door. Need the exit discharge light repaired at the main north exit. Curbing needs painted for fire dept access. One additional fire extinguisher is needed in the second floor corridor.
|
BLD-Conference | 1/8/2009 | 1/8/2009 | 1/8/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 1/8/2009 | 1/8/2009 | 1/8/2009 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 11/20/2008 | 11/21/2008 | 11/21/2008 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/20/2008 at 12:58:03 PM. Contact: ###-####. grid ok
|
BLD-Wall cover | 10/31/2008 | 11/3/2008 | 11/3/2008 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/31/2008 at 1:17:29 PM. Contact: ###-####.
|
BLD-Energy code compliance | 10/7/2008 | 10/7/2008 | 10/7/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/7/2008 at 10:49:30 AM. Contact: ###-####.ok to cover ext walls
|
BLD-Energy code compliance | 9/19/2008 | 9/19/2008 | 9/19/2008 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/19/2008 at 7:10:14 AM. Contact: ###-####.
|
BLD-Wall cover | 9/16/2008 | 9/17/2008 | 9/17/2008 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/16/2008 at 5:30:10 PM. Contact: ###-####. Verified vapor barrier at 2nd floor ceiling, north half. ok to cover.
|
BLD-Wall cover | 9/16/2008 | 9/17/2008 | 9/17/2008 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/16/2008 at 1:57:41 PM. Contact: ###-####. Interior and exterior nailing for shear (at stair towers) ..... and both stair tower walls OK ......OK to insulate, rock and stucco.
|
BLD-Energy code compliance | 9/12/2008 | 9/15/2008 | 9/15/2008 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/12/2008 at 12:46:28 PM. Contact: ###-####. 2-3 b-c attic blowen full.
|
BLD-Framing/Rough-in | 9/4/2008 | 9/4/2008 | 9/4/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/4/2008 at 7:49:25 AM. Contact: ###-####. Nailing and straps for roof diaphragm between grids 1-4 and C-D.
|
BLD-Wall cover | 9/2/2008 | 9/3/2008 | 9/3/2008 | P | DONE |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/2/2008 at 10:54:35 AM. Contact: ###-####.
|
BLD-Wall cover | 9/2/2008 | 9/2/2008 | 9/2/2008 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/2/2008 at 7:50:48 AM. Contact: ###-####. (2) Interior shear walls.... Lobby rm 151 and near West stair tower..... OK
|
BLD-Other | 8/28/2008 | 8/29/2008 | 8/29/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/28/2008 at 1:47:12 PM. Contact: ###-####. Inspected nailing for roof diaphragm and verified required straps between gris 1-7 and a-b
|
BLD-Wall cover | 8/25/2008 | 8/26/2008 | 8/26/2008 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/25/2008 at 4:53:18 PM. Contact: ###-####. Roof framing OK
|
BLD-Framing/Rough-in | 8/26/2008 | 8/26/2008 | 8/26/2008 | P | PART |
Jim Sly
|
|
|
Scheduled by ###-#### OK to totally fill roof joist bays in leiu of installing sprinklers.....roof framing ok
|
BLD-Energy code compliance | 8/26/2008 | 8/26/2008 | 8/26/2008 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/26/2008 at 6:46:22 AM. Contact: ###-####. 1st floor select Ext. walls
|
BLD-Framing/Rough-in | 8/21/2008 | 8/22/2008 | 8/22/2008 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/21/2008 at 5:14:27 PM. Contact: ###-####. !st floor appears OK........Needs firestop on a few through electrical box penitrations at 1hr walls.
|
BLD-Conference | 7/31/2008 | 8/1/2008 | 8/1/2008 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/31/2008 at 3:34:26 PM. Contact: ###-####.
|
BLD-Conference | 7/30/2008 | 7/31/2008 | 7/31/2008 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/30/2008 at 3:27:30 PM. Contact: ###-####.
|
BLD-Conference | 7/29/2008 | 7/30/2008 | 7/30/2008 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/29/2008 at 2:15:35 PM. Contact: ###-####. easr side is afull fill of insulation in ceiling
|
BLD-Framing/Rough-in | 7/24/2008 | 7/25/2008 | 7/25/2008 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/24/2008 at 8:19:04 AM. Contact: ###-####. lid ok pending other inspections
|
BLD-Foundation | 5/29/2008 | 5/30/2008 | 5/30/2008 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/29/2008 at 3:10:32 PM. Contact: ###-####.
|
BLD-Footing | 5/23/2008 | 5/27/2008 | 5/27/2008 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/23/2008 at 12:38:23 PM. Contact: ###-####. spec insp on site
|