Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberBLD08-00234
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 1122 N LIBERTY RD
Project NameApollo College
Customer Number 
ePlanReviewNo
Description
Apollo College (Classroom and Administration Building) - To construct a new 23,550 square foot, two story, wood framed classroom and administration building and related site improvements. First Floor: 12,000 square feet, Second Floor: 11,550 square feet. This building is fully fire sprinkled. The sprinklers are used for area increase. All construction per the approved plans and attached comment list. JCM//Plan modification submitted 6-13-08 to relocate a new seepage bed further south, the existing catch basin location will direct storm via pipe to the new basin approved per Brian Murphy 6-19-08 BAS
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/26/20095/28/20095/28/2009APASS
DetailsTom Arcoraci
Jan Phone #: ###-#### ok for perm occ
BLD-Aging Inspection5/20/20095/20/20095/20/2009 DEFR
DetailsTom Arcoraci
zoning issue
BLD-Conference3/18/20093/18/20093/18/2009APASS
DetailsTom Arcoraci
on temp
BLD-Aging Inspection3/18/20093/18/20093/18/2009 PASS
DetailsTom Arcoraci
BLD-Final1/15/20091/16/20091/16/2009APART
DetailsTom Arcoraci
jan Note: late morning please Phone #: ###-#### pending zoning sign off
FIRE-Final Inspection1/15/20091/16/20091/16/2009APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection1/13/20091/14/20091/14/2009AFAIL
DetailsTroy Cobbley
Need the project related fire alarm permit finaled. Need approved hardware installed on the pocket doors, approved hardware on the south exit door and the east exit door. Need the exit discharge light repaired at the main north exit. Curbing needs painted for fire dept access. One additional fire extinguisher is needed in the second floor corridor.
BLD-Conference1/8/20091/8/20091/8/2009PPASS
DetailsTom Arcoraci
BLD-Conference1/8/20091/8/20091/8/2009APASS
DetailsTom Arcoraci
BLD-Wall cover11/20/200811/21/200811/21/2008PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/20/2008 at 12:58:03 PM. Contact: ###-####. grid ok
BLD-Wall cover10/31/200811/3/200811/3/2008APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/31/2008 at 1:17:29 PM. Contact: ###-####.
BLD-Energy code compliance10/7/200810/7/200810/7/2008PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/7/2008 at 10:49:30 AM. Contact: ###-####.ok to cover ext walls
BLD-Energy code compliance9/19/20089/19/20089/19/2008APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/19/2008 at 7:10:14 AM. Contact: ###-####.
BLD-Wall cover9/16/20089/17/20089/17/2008PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/16/2008 at 5:30:10 PM. Contact: ###-####. Verified vapor barrier at 2nd floor ceiling, north half. ok to cover.
BLD-Wall cover9/16/20089/17/20089/17/2008APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/16/2008 at 1:57:41 PM. Contact: ###-####.
Interior and exterior nailing for shear (at stair towers) ..... and both stair tower walls OK ......OK to insulate, rock and stucco.
BLD-Energy code compliance9/12/20089/15/20089/15/2008APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/12/2008 at 12:46:28 PM. Contact: ###-####. 2-3 b-c attic blowen full.
BLD-Framing/Rough-in9/4/20089/4/20089/4/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/4/2008 at 7:49:25 AM. Contact: ###-####. Nailing and straps for roof diaphragm between grids 1-4 and C-D.
BLD-Wall cover9/2/20089/3/20089/3/2008PDONE
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/2/2008 at 10:54:35 AM. Contact: ###-####.
BLD-Wall cover9/2/20089/2/20089/2/2008PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/2/2008 at 7:50:48 AM. Contact: ###-####.
(2) Interior shear walls.... Lobby rm 151 and near West stair tower..... OK
BLD-Other8/28/20088/29/20088/29/2008APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/28/2008 at 1:47:12 PM. Contact: ###-####. Inspected nailing for roof diaphragm and verified required straps between gris 1-7 and a-b
BLD-Wall cover8/25/20088/26/20088/26/2008PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/25/2008 at 4:53:18 PM. Contact: ###-####.
Roof framing OK
BLD-Framing/Rough-in8/26/20088/26/20088/26/2008PPART
DetailsJim Sly
Scheduled by ###-####
OK to totally fill roof joist bays in leiu of installing sprinklers.....roof framing ok
BLD-Energy code compliance8/26/20088/26/20088/26/2008APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/26/2008 at 6:46:22 AM. Contact: ###-####.
1st floor select Ext. walls
BLD-Framing/Rough-in8/21/20088/22/20088/22/2008PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/21/2008 at 5:14:27 PM. Contact: ###-####.
!st floor appears OK........Needs firestop on a few through electrical box penitrations at 1hr walls.
BLD-Conference7/31/20088/1/20088/1/2008PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/31/2008 at 3:34:26 PM. Contact: ###-####.
BLD-Conference7/30/20087/31/20087/31/2008PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/30/2008 at 3:27:30 PM. Contact: ###-####.
BLD-Conference7/29/20087/30/20087/30/2008PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/29/2008 at 2:15:35 PM. Contact: ###-####. easr side is afull fill of insulation in ceiling
BLD-Framing/Rough-in7/24/20087/25/20087/25/2008PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/24/2008 at 8:19:04 AM. Contact: ###-####. lid ok pending other inspections
BLD-Foundation5/29/20085/30/20085/30/2008APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/29/2008 at 3:10:32 PM. Contact: ###-####.
BLD-Footing5/23/20085/27/20085/27/2008APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/23/2008 at 12:38:23 PM. Contact: ###-####. spec insp on site