BLD-Final | 6/2/2008 | 6/3/2008 | 6/3/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 6/2/2008 at 2:14:10 PM. Contact: ###-####. Vertical grab bars installed at correct height. tempered glazing installed. ok for perm occ.
|
BLD-Final | 5/21/2008 | 5/22/2008 | 5/22/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/21/2008 at 2:56:07 PM. Contact: ###-####. ok for temp occ. Needs to mount vertical grab bar at correct height. Install remaining safty glazing.
|
FIRE-Final Inspection | 5/21/2008 | 5/22/2008 | 5/22/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Other | 5/13/2008 | 5/14/2008 | 5/14/2008 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/13/2008 at 4:25:55 PM. Contact: ###-####.
|
BLD-Other | 5/14/2008 | 5/14/2008 | 5/14/2008 | A | PASS |
Mike Jordan
|
|
|
|
BLD-Other | 5/12/2008 | 5/13/2008 | 5/14/2008 | P | DEFR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/12/2008 at 10:37:12 AM. Contact: ###-####. no time
|
BLD-Energy code compliance | 4/8/2008 | 4/9/2008 | 4/9/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/8/2008 at 7:29:08 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/8/2008 | 4/9/2008 | 4/9/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/8/2008 at 7:28:33 PM. Contact: ###-####. Interior steel stud framed walls and hardlid only. no grid.
|