Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD08-00379
StatusFinaled
Name GUHO CORP
Site Address 405 S 8TH ST
Project Name8TH STREET MARKETPLACE
Customer Number 
ePlanReviewNo
Description
(8TH STREET MARKETPLACE - 405 SOUTH 8TH STREET - THE NORTHRUP BUILDING) (10-28-08 PLAN MODIFICATION TO REDUCE THE NUMBER OF TOILET FIXTURES WITHIN THE MEN'S RESTROOM LOCATED ON THE 3RD STORY TO ONE.) This building is fire sprinklered to substitute for 1-hr fire-resistance-rated construction of the building. To remodel the building core area in the basement, on the 1st story, on the 2nd story, and on the 3rd story of the 8th Street Marketplace building located at 405 S. 8th Street. Work is to include a 156 square foot floor infill within the existing atrium, new guards, new handrails, upgraded restrooms on the 3rd story, new doors at stairway intermediate landings in the atrium at the basement and 1st story, two new exterior double doors at grade, and interior finishes. The existing 1st story wheelchair lift will be maintained. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection5/20/20145/20/20145/22/2014 PASS
DetailsDave Hannah
DOC - Permit Finaled5/22/20145/22/20145/22/2014APASS
DetailsDave Hannah
BLD-Final2/18/20142/19/20142/19/2014APASS
DetailsDave Hannah
Boyd Phone #: ###-####
FIRE-Final Inspection2/14/20142/18/20142/18/2014PPASS
DetailsForrest France
C/N items verified for completion. Scope of work finished. Fire life safety finaled.
FIRE-Final Inspection2/13/20142/18/20142/14/2014APART
DetailsForrest France
C/N items completed per contractor. Final walkthrough scheduled 2/18
BLD-Aging Inspection2/10/20142/10/20142/14/2014 PEND
DetailsDave Hannah
BLD-Final2/11/20142/12/20142/12/2014ANR
DetailsDave Hannah
Boyd Phone #: ###-#### needs fire life saftey final first
BLD-Aging Inspection10/22/201310/22/201310/23/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection7/23/20137/23/20137/24/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection3/11/20133/11/20133/13/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection11/29/201211/29/201212/7/2012 PEND
DetailsDave Hannah
BLD-Final8/21/20128/22/20128/22/2012PCANC
DetailsDave Hannah
DAVID Phone #: ###-####
FIRE-Final Inspection8/21/20128/22/20128/22/2012AFAIL
DetailsTroy Cobbley
Provide exit signs and emergency lighting on all floors as redlined by myself and Carl Westfall on the city approved plans. Also resubmit plans showing the new door at the basement intermediate level stairs being deleted. The "nuclear" exit signs are good until 2017.
BLD-Final8/20/20128/21/20128/22/2012PPART
DetailsDave Hannah
david Phone #: ###-#### project ok but needs fire final
BLD-Final8/17/20128/20/20128/20/2012PCANC
DetailsDave Hannah
David Phone #: ###-####/////Cancelled by David 8/20 11AM
BLD-Framing/Rough-in7/17/20127/19/20127/20/2012PPASS
DetailsDave Hannah
David Phone #: ###-####
DOC - Permit Expired9/1/20109/1/20109/1/2010PPASS
DetailsDave Hannah
DOC - Permit Finaled9/1/20109/1/20109/1/2010PPASS
DetailsDave Hannah
BLD-Aging Inspection8/25/20108/25/20109/1/2010 PASS
DetailsDave Hannah
BLD-Framing/Rough-in9/11/20089/11/20089/12/2008PPART
DetailsDave Hannah
rick Phone #: ###-#### ok to cover shaftin basement
FIRE-Final Inspection9/11/20089/11/20089/11/2008PCANC
DetailsForrest France
Incorrect permit number request.
BLD-Aging Inspection8/11/20088/11/20088/11/2008 PASS
DetailsDave Hannah
wip