BLD-Final | 10/8/2008 | 10/8/2008 | 10/9/2008 | P | PASS |
Jim Storey
|
|
|
ron Phone #: ###-####
|
DOC - Permit Finaled | 10/9/2008 | 10/9/2008 | 10/9/2008 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 7/21/2008 | 7/22/2008 | 7/22/2008 | A | PART |
Jim Storey
|
|
|
ron Phone #: ###-#### screw sch and lap of gyp aplacation ok need to do top fo wall detail per plan.
|
BLD-Foundation | 7/8/2008 | 7/8/2008 | 7/8/2008 | P | PASS |
Jim Storey
|
|
|
Ian Phone #: ###-####
|
BLD-Footing | 7/7/2008 | 7/7/2008 | 7/7/2008 | P | PASS |
Jim Storey
|
|
|
een Phone #: ###-####
|
BLD-Framing/Rough-in | 7/2/2008 | 7/2/2008 | 7/2/2008 | P | PART |
Mike Jordan
|
|
|
Ron Phone #: ###-####. 2nd layer 5/8 type X exterior rock on exterior side of 2hr. wall on gridline F. Noted architects to resubmit new details for column wrap and top of wall attachment on interior side.
|
BLD-Wall cover | 6/30/2008 | 7/1/2008 | 7/1/2008 | P | PART |
Mike Jordan
|
|
|
Ron, early afternoon if possible; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. 1st layer of 5/8 type X, exterior side, for 2hr. wall on gridline F.
|
BLD-Wall cover | 6/11/2008 | 6/12/2008 | 6/12/2008 | A | DONE |
Jim Storey
|
|
|
Ian Phone #: ###-#### cloned foudation wall insp.
|
BLD-Foundation | 6/12/2008 | 6/12/2008 | 6/12/2008 | P | PASS |
Jim Storey
|
|
|
Ian Phone #: ###-####
|
BLD-Foundation | 6/6/2008 | 6/6/2008 | 6/10/2008 | P | CANC |
Jim Storey
|
|
|
ian Phone #: ###-####
|
BLD-Footing | 6/6/2008 | 6/6/2008 | 6/6/2008 | P | PART |
Jim Storey
|
|
|
ian Phone #: ###-#### pads ok verts in progress south wall ok si to be on site monday for the rest of the ft assembly.
|