Permit Information
Permit NumberBLD08-00399
StatusFinaled
Name HILL CONSTRUCTION CO
Site Address 8585 W OVERLAND RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Boise New Hope of the Nazarene Church (Addition) To convert the sanctuary, offices, storage and entry in the existing 4,180 square foot building to additional classrooms and nursery. The existing building will contain classrooms and restrooms. To construct a 10,220 square foot, one story addition on the east side of the existing church building. The addition will contain new administrative offices, restrooms, large entry, sanctuary, multi-purpose room, kitchen and storage room. All areas of this building will be fully fire sprinkled. The sprinklers are used for area increase. All construction per the approved plans and attached comment list. JCM nstruct as
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/19/20092/20/20092/20/2009APASS
DetailsTom Arcoraci
john - mid-morning please Phone #: ###-####
FIRE-Final Inspection2/19/20092/20/20092/20/2009APASS
DetailsTroy Cobbley
fire life safety passed
BLD-Other1/29/20091/29/20091/29/2009PPASS
DetailsJim Storey
john Note: sheet rock Phone #: ###-#### sw coner ok for cover.
BLD-Energy code compliance1/7/20091/8/20091/8/2009APASS
DetailsMike Jordan
john Phone #: ###-####
BLD-Other1/2/20091/2/20091/2/2009PPART
DetailsDave Hannah
JOHN - NOTE; COVER Phone #: ###-#### ok to insulate ok to one side contractor will use insulation for fire blocking on hallway walls
BLD-Final12/8/200812/8/200812/8/2008PPASS
DetailsMike Jordan
john- temporary occupancy Phone #: ###-####. Ok for temp occ.
BLD-Final12/5/200812/5/200812/5/2008PNR
DetailsMike Jordan
BLD-Final12/4/200812/4/200812/4/2008PNR
DetailsMike Jordan
john Phone #: ###-####
FIRE-Final Inspection12/1/200812/2/200812/3/2008APART
DetailsTroy Cobbley
Per Ken Roule and Mark Sentenno the new area can be occupied until the existing areas have been remodeled and the rest of the construction is completed.
FIRE-Final Inspection11/20/200811/21/200811/21/2008APART
DetailsTroy Cobbley
See redlined notes on city approved plans of area tested and completed. Contractor is looking for a temp occupancy for this area while they remodel the existing building under the same building permit. Contractor will be required tto contact Mark Senteno for temp occupancy. KR
BLD-Energy code compliance9/17/20089/18/20089/18/2008APASS
DetailsMike Jordan
John Phone #: ###-####. ok to cover.
BLD-Framing/Rough-in9/18/20089/18/20089/18/2008APART
DetailsMike Jordan
John Phone #: ###-####. All framing issues resolved. ok to insul. issued c/n to contractor to have architect supply detalis for 1hr wall and ceiling assemblies for fire riser room.
BLD-Framing/Rough-in9/8/20089/8/20089/8/2008PPART
DetailsMike Jordan
john Phone #: ###-####. Needs to do airseal, complete nailing of hangars,and girder trusses.
BLD-Conference8/25/20088/26/20088/26/2008APASS
DetailsMike Jordan
john Phone #: ###-####. ME twith contractor on site to go over specs for platform lift to stage.
BLD-Framing/Rough-in8/12/20088/12/20088/12/2008PNR
DetailsMike Jordan
john Phone #: ###-####. Needs ri insp. from other trades first.
BLD-Framing/Rough-in7/21/20087/22/20087/22/2008APART
DetailsMike Jordan
John Phone #: ###-####. Nailing for roof diaphragm, hand stack portion of roof framing and roof to cmuwall connections.
BLD-Framing/Rough-in7/10/20087/11/20087/11/2008APART
DetailsMike Jordan
john Phone #: ###-####. Shear nailing on exterior walls ok. Also reveiwed special insp. reports on puddle wels and joist to base plate connections for gym roof. ok. Als noted rfi from engineer on conversions for staples.
BLD-Framing/Rough-in7/7/20087/8/20087/8/2008APART
DetailsMike Jordan
John Phone #: ###-####. Need RFI from engineer of record for use of staples in leiu of nails for shear wall. Needs to provide straps at double top plate splices and complete install of straps from cmu wall to roof diaphragm.
BLD-Concrete6/10/20086/11/20086/11/2008ADEFR
DetailsMike Jordan
John Phone #: ###-####. Placement for slab on grade, non structural item. Special insp. on site. Will reveiw reports on next insp.
BLD-Other6/9/20086/10/20086/9/2008ACANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/9/2008 at 12:12:57 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jun 9 2008 1:04PM.
BLD-Footing5/29/20085/30/20085/30/2008ADEFR
DetailsMike Jordan
john Phone #: ###-####. Conc. placed when on site. Noted special insp. on site.
BLD-Foundation5/23/20085/23/20085/23/2008PPART
DetailsMike Jordan
john Note: pouring concrete at 1:00 pm Phone #: ###-####
BLD-Footing5/22/20085/22/20085/22/2008PPART
DetailsJim Sly
john - pouring at 2:30 Phone #: ###-####
Footing gridline F 5........Wall Gridline J 6.....OK pending MTI special inspections, tests, and approvals.
BLD-Footing5/21/20085/21/20085/21/2008PPART
DetailsMike Jordan
John; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Stemwall at existing bldg. and north side.
BLD-Footing5/19/20085/19/20085/19/2008PPART
DetailsMike Jordan
john Note: concrete coming by 1:00 Phone #: ###-####. North footing.
BLD-Footing5/15/20085/16/20085/16/2008APART
DetailsMike Jordan
john Phone #: ###-####. wip on perimeter footings. Noted that job wil have special insp. Also reviewed special insp. reports for soils work done to date. Noted to contractor that city approved plans need to be on the job site.