Permit Information
Permit NumberBLD08-00418
StatusFinaled
Name MODULAR STRUCTURES INC
Site Address 1705 S MILWAUKEE ST
Project NameDARMODY OFFICE BLDG
Customer Number 
ePlanReviewNo
Description
Darmody Office Building - To construct a new 9,765 square foot, two story, wood framed office and storage building. There is also a 775 square foot storage mezzanine above storage area #115. Carport - Some of the construction documents indicate a carport on the north side of the proposed building. As indicated on the construction documents, this is a future addition and is not part of the scope of work under this building permit. A separate permit will be required to construct the carport. The future carport will need to be separated from those areas of the building required to be separted by fire barriers. First Floor: 6,225 sq. ft., Second Floor: 3,540 sq. ft.. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/22/20091/23/20091/29/2009PPASS
DetailsMike Jordan
carl Phone #: ###-####. ok for perm occ.
FIRE-Final Inspection1/22/20091/23/20091/23/2009APASS
DetailsTroy Cobbley
Life safety passed.
BLD-Final12/5/200812/5/200812/5/2008PPART
DetailsMike Jordan
OK for temp occ. Still needs to provide additional ada signage, instal vertical grab bars in restrooms and repair handrail in storage room, not bein utilized at this time.
FIRE-Final Inspection12/4/200812/5/200812/5/2008APART
DetailsTroy Cobbley
A temporary occupancy was given with sam rogers and gordon goldsmiths permission until the missing fire hydrant is installed, in-duct detectors are installed for operation of the fire/smoke dampers, the exit discharge light is repaired at the main exit, the "Area of Refuge" sign is provided with battery backup and permanent area of refuge signs are placed. Temporary signs have been installed at this time.
BLD-Final12/4/200812/5/200812/5/2008ADEFR
DetailsMike Jordan
carl Phone #: ###-####
FIRE-Final Inspection12/2/200812/3/200812/3/2008AFAIL
DetailsTroy Cobbley
See the front sheet of the city approved drawings for the required corrections which include providing the missing fire hydrant, repair the exit discharge light at the main exit, provide emergency lighting in the main lobby, repair the area of refuge sign on the second floor, provide the area of refuge communication equipment and signage, provide the occupant load sign, mount fire extinguishers and provide the fire lane signage. Also the duct smoke detectors need to be replaced with spot type detectors that are listed for the air flow. These detectors are for damper operation.
FIRE-Conference11/25/200811/25/200811/25/2008PDONE
DetailsTroy Cobbley
carl Phone #: ###-####
BLD-Other11/20/200811/21/200811/21/2008APART
DetailsMike Jordan
carl - fire caulking Phone #: . Areas above grid ok. Needs to stub out at cleanout and make membrane penetration and provide collars at pvc pipe for soda machine.
BLD-Other11/19/200811/20/200811/20/2008APART
DetailsMike Jordan
carl Note: ceiling grid Phone #: ###-####. Ceiling grid, 1st. floor ok, except at areas around 1 and 2 hr. walls. fire caulking not yet complete. Tiles will be left out at these areas.
BLD-Framing/Rough-in11/18/200811/19/200811/19/2008APASS
DetailsMike Jordan
carl - first thing in the morning please Phone #: ###-####. handrail ok.
BLD-Other11/12/200811/12/200811/12/2008PPART
DetailsMike Jordan
carl Note: ceiling grid Phone #: ###-####. Ceiling grid 2nd. floor only. Pend. mech and elec.
BLD-Conference11/10/200811/10/200811/10/2008PPASS
DetailsMike Jordan
BLD-Other11/5/200811/6/200811/6/2008AFAIL
DetailsMike Jordan
CARL Phone #: ###-####. Grid ceiling on 2nd. floor not installed as per approved plan. Also still needs elec. and mech ri insp. above grid.
BLD-Framing/Rough-in10/10/200810/13/200810/13/2008APASS
DetailsMike Jordan
Carl Phone #: ###-####. Verified dratstop at 2nd floor and all fireblocking.
BLD-Framing/Rough-in10/6/200810/6/200810/6/2008PPART
DetailsMike Jordan
1st layer 5/8 type for ceiling assembly.
BLD-Energy code compliance9/29/20089/30/20089/30/2008APASS
DetailsMike Jordan
carl Phone #: ###-####. ok to cover.
BLD-Framing/Rough-in9/30/20089/30/20089/30/2008APASS
DetailsMike Jordan
carl Phone #: ###-####. Interior and exterior wood framed walls on 1st. floor and storage area. 1st and 2nd layers of 5/8 type x at 2hr. walls.
BLD-Energy code compliance9/25/20089/26/20089/26/2008PNR
DetailsMike Jordan
Carl- early pm please Phone #: ###-####
BLD-Framing/Rough-in9/26/20089/26/20089/26/2008PPART
DetailsMike Jordan
Carl- early pm please Phone #: ###-####. Screw pattern for 1st. layer of 5/8 typex at 2hr wall.
BLD-Framing/Rough-in9/25/20089/25/20089/25/2008PPART
DetailsMike Jordan
Interior wood framed walls on 2nd fllor and hardlids. ok to insul.
BLD-Framing/Rough-in9/12/20089/12/20089/12/2008APART
DetailsMike Jordan
Interior shearwall at south stairtower and breakroom. Needs to install straps on girder trusses to beam and need approval from engineer of record for use of staples.
BLD-Framing/Rough-in9/8/20089/8/20089/8/2008PPART
DetailsMike Jordan
carl Phone #: ###-####. Went over 1hr and two const. requirements.
BLD-Foundation8/5/20088/5/20088/5/2008PPASS
DetailsMike Jordan
carl - as early as possible please Phone #: ###-####. Interior column pad footing in storage garage.
BLD-Footing8/4/20088/4/20088/4/2008PNR
DetailsMike Jordan
Carl Phone #: ###-####
BLD-Footing7/18/20087/21/20087/21/2008APART
DetailsMike Jordan
steve Note: mud in 10:30 am Phone #: ###-####. Perimeter stemwalls and elevator pit walls. Will have special insp.
BLD-Footing7/14/20087/14/20087/16/2008PDEFR
DetailsMike Jordan
Steve Phone #: ###-####. Special insp. conc. placed in am.