Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD08-00424
StatusFinaled
Name MILLER CONSTRUCTION CORP
Site Address 2779 S LIBERTY RD
Project NameLIBERTY STREET OFFICE/SHOP
Customer Number 
ePlanReviewNo
Description
Liberty Street Office/Shop - To construct a new 7,700 square foot, one story office and shop building and related site improvements. The building is constructed of wood frame with masonry exterior walls at the shop portion of the building. Office, covered patio and entry 2,590 square feet; shop, mezzanine, and storage areas 5,110 square feet. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection3/2/20093/2/20093/2/2009 PASS
DetailsTom Arcoraci
BLD-Final12/29/200812/29/200812/29/2008PPASS
DetailsTom Arcoraci
Jake Phone #: ###-####
BLD-Final12/16/200812/17/200812/17/2008AFAIL
DetailsTom Arcoraci
jake Phone #: ###-#### cn posted
FIRE-Final Inspection12/16/200812/16/200812/16/2008PPASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection12/11/200812/12/200812/12/2008AFAIL
DetailsTroy Cobbley
Provide building address, provide a tagged fire extinguisher for the mezzanine in the shop, remove the thumbturn from the main exit (keyed is ok), the southwest exit door is to have approved single action hardware as per the hardware schedule, remove the deadbolt from the shop door, provide the missing exit discharge light, provide emergency lighting as per the plans and provide annunciators and test the duct smoke detectors.
BLD-Aging Inspection12/3/200812/3/200812/3/2008 PASS
DetailsTom Arcoraci
BLD-Energy code compliance9/17/20089/18/20089/18/2008PPASS
DetailsJim Sly
jake Phone #: ###-####
BLD-Framing/Rough-in9/15/20089/15/20089/15/2008PFAIL
DetailsJim Sly
jake Note: also calking Phone #: ###-####
C/N....Toilets 16-18 " from finished wall....Stiil need truss Eng. OK to insulate.
BLD-Framing/Rough-in9/12/20089/12/20089/12/2008AFAIL
DetailsMike Jordan
clack and seal also. Provide approved plans and truss engineering for framing insp. Job shack locked. No one on site could help.
BLD-Other9/11/20089/12/20089/12/2008ACANC
DetailsMike Jordan
Jake- seal Phone #: ###-####
BLD-Other8/4/20088/4/20088/4/2008PPASS
DetailsJim Storey
Jake- nail insp Phone #: ###-#### sheer walls and roof nailling ok
BLD-Other6/30/20087/1/20087/1/2008APASS
DetailsTom Arcoraci
jake Note: 8:00 am grout inspection for the block Phone #: ###-#### spec insp on site
BLD-Foundation6/3/20086/4/20086/4/2008APART
DetailsTom Arcoraci
jake Phone #: ###-####
BLD-Footing5/28/20085/29/20085/29/2008APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/28/2008 at 12:18:26 PM. Contact: ###-####. Perimeter footings, interior footings and column pad footings. Special inspector to note on report the missing #5 bars under girder truss bearings being installed prior to placement of conc. in this area.