BLD-Final | 4/7/2009 | 4/8/2009 | 4/8/2009 | A | PASS |
Dave Hannah
|
|
|
bob Phone #: ###-####
|
DOC - Permit Finaled | 4/8/2009 | 4/8/2009 | 4/8/2009 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 3/31/2009 | 4/1/2009 | 4/1/2009 | P | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-#### needs temp glass master bath needs elec and fire place finaled also
|
BLD-Grading Inspection | 3/30/2009 | 3/30/2009 | 3/30/2009 | A | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
BLD-Energy code compliance | 8/26/2008 | 8/26/2008 | 8/26/2008 | P | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-#### ok to cover
|
BLD-Framing/Rough-in | 8/18/2008 | 8/19/2008 | 8/19/2008 | A | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-#### ok to insulate
|
BLD-Energy code compliance | 8/14/2008 | 8/14/2008 | 8/14/2008 | P | PART |
Dave Hannah
|
|
|
BOB Phone #: ###-#### ok to spray ceiling in kitchen and rim in basement along rad
|
BLD-Framing/Rough-in | 7/9/2008 | 7/10/2008 | 7/10/2008 | A | PART |
Jim Storey
|
|
|
Bob Phone #: ###-#### nailling ok need engineer to address 24 on center spacing of brace panel studs designed at 16 oc.
|
BLD-Conference | 7/7/2008 | 7/7/2008 | 7/7/2008 | P | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Foundation | 5/13/2008 | 5/13/2008 | 5/13/2008 | P | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/13/2008 at 7:42:05 AM. Contact: ###-####.
|
BLD-Foundation | 5/12/2008 | 5/13/2008 | 5/13/2008 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/12/2008 at 6:01:44 PM. Contact: ###-####.
|
BLD-Footing | 5/9/2008 | 5/12/2008 | 5/12/2008 | A | PASS |
Dave Hannah
|
|
|
ben Phone #: ###-####
|
BLD-Foundation | 4/21/2008 | 4/22/2008 | 4/22/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/21/2008 at 4:42:36 PM. Contact: ###-####. Basement walls only.
|
BLD-Footing | 4/14/2008 | 4/15/2008 | 4/15/2008 | P | PART |
Dave Hannah
|
|
|
ben Phone #: ###-#### ok to pour basement footings
|