Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-00434
StatusExpired
Name WOODS CONSTRUCTION INC
Site Address 300 N MILWAUKEE ST
Project NameJC PENNY
Customer Number 
ePlanReviewNo
Description
**(JC PENNY)** To remodel an existing 154,202 sq. ft. retail sales store on the first and second floors per approved plans. Work to include, selective demolition under Bld08-00433, new construction of interior noncombustible partitions to create new fitting rooms, remodel restrooms for accessibility, remove and replace escalators, install new flooring, display lighting, cash wraps, display counters, remodel existing salon, replace sinks and counters, miscellaneous related interior improvements. This building is fully fire sprinklered any alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department. RmH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection7/1/20107/1/20107/6/2010 CANC
DetailsMike Jordan
DOC - Permit Expired7/6/20107/6/20107/6/2010PPASS
DetailsMike Jordan
Permit is expired. All other trades have finaled.
BLD-Framing/Rough-in7/1/20087/1/20087/1/2008PPART
DetailsMike Jordan
Interior steell stud framed wing wall in womens restroom, also verified backing for ADA reqiurements in womens and mens restroom at 1st floor, south enterance. Noted to contractor that insp. is pending plumbing ri insp.
BLD-Framing/Rough-in6/30/20087/1/20087/1/2008APASS
DetailsMike Jordan
Bruce Phone #: ###-####. Interior steel stud framed walls for dressing room at womens appreal on 1st. floor.
BLD-Framing/Rough-in6/10/20086/11/20086/11/2008APASS
DetailsMike Jordan
Jay- womans fitting room Phone #: ###-####. Interior steel stud framing for fitting rooms, womans section, 1st. floor.
BLD-Framing/Rough-in6/5/20086/9/20086/9/2008APASS
DetailsMike Jordan
Jay Phone #: ###-####. BAcking for ada grab bars at bathroom remodel, 2nd floor, catalog area.
BLD-Framing/Rough-in6/2/20086/3/20086/3/2008APASS
DetailsMike Jordan
bruce Phone #: 586-855-234. interior framed walls for fitting room, 1st floor, womens apperal.
BLD-Framing/Rough-in5/22/20085/27/20085/27/2008APART
DetailsMike Jordan
bruce Phone #: ###-####. Interior framed wall for new dispaly wall and dressing rooms at boys clothes, 1st. floor.
BLD-Framing/Rough-in5/15/20085/19/20085/19/2008APASS
DetailsMike Jordan
bruce Phone #: ###-####. New dressing rooms 1st. floor.
BLD-Framing/Rough-in5/7/20085/8/20085/8/2008APASS
DetailsMike Jordan
Bruce; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Interior framed wall for new display wall in kids section, 1st. floor.
BLD-Framing/Rough-in5/2/20085/5/20085/5/2008APASS
DetailsMike Jordan
bruce Phone #: ###-####. Framing for new display wall, and bulkhead extension for increase in sales area on 1st. floor.
BLD-Framing/Rough-in4/30/20085/1/20085/1/2008APASS
DetailsMike Jordan
bruce Phone #: ###-####. Interior framed walls on 1st. floor at Jr's section and for new safe room.
BLD-Framing/Rough-in4/18/20084/21/20084/21/2008APART
DetailsMike Jordan
bruce Phone #: ###-####. Mens changing rooms, 2nd floor by levis section.
BLD-Conference4/15/20084/16/20084/16/2008PDONE
DetailsMike Jordan
Pick up plan changes for restroom, security closet and cashraps to take to plan reveiw to be scanned.
BLD-Conference4/15/20084/16/20084/16/2008ACANC
DetailsMike Jordan
bruce Phone #: ###-####
BLD-Framing/Rough-in4/8/20084/9/20084/9/2008APASS
DetailsMike Jordan
Bruce Phone #: ###-#### Interior steel stud framed walls for new changing rooms on 1st. floor at womens accessories.
BLD-Framing/Rough-in4/2/20084/3/20084/3/2008APART
DetailsMike Jordan
partial r/i -- Bruce Shannon ###-####. New fur out wall on 1st floor next to existing escalator going up, New framing on 1st floor at womens accessories.