BLD-Final | 6/18/2009 | 6/18/2009 | 6/18/2009 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/18/2009 at 8:44:07 AM. Received final affidavit letter from Special insp agency.....and final letter from Engineer of record. OK for Perm Occ.
|
BLD-Final | 6/17/2009 | 6/17/2009 | 6/17/2009 | P | CANC |
Jim Sly
|
|
|
Nick Phone #: ###-####
|
BLD-Final | 6/12/2009 | 6/12/2009 | 6/12/2009 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/12/2009 at 9:32:23 AM. Contact: ###-####. Need Zoning Final, Final letter Engineer and STRATA.
|
FIRE-Final Inspection | 6/11/2009 | 6/12/2009 | 6/12/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Conference | 6/9/2009 | 6/9/2009 | 6/9/2009 | P | DONE |
Troy Cobbley
|
|
|
The curtains along the south wall can not block the required exit doors at any time. The south exit door in the main library is required and atleast one of the south facing doors in the southeast corner room is required.
|
BLD-Framing/Rough-in | 4/22/2009 | 4/23/2009 | 4/23/2009 | A | PART |
Jim Sly
|
|
|
gary - ceiling grid Phone #: ###-####
|
BLD-Framing/Rough-in | 1/19/2009 | 1/20/2009 | 1/20/2009 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/19/2009 at 11:41:42 AM. Contact: ###-####. OK to (1) side all walls........OK to insulate. C/N......Protect penitrations in 1hr wall at book deposit room......ie. Sewer clean out and water valve.
|
BLD-Foundation | 9/8/2008 | 9/9/2008 | 9/9/2008 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/8/2008 at 11:05:52 AM. Contact: ###-####. walls at childerns encloser. ok
|
BLD-Footing | 9/2/2008 | 9/3/2008 | 9/3/2008 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/2/2008 at 8:29:44 AM. Contact: ###-####. Footings for retaining walls OK pending STRATA insp, tests and approvals
|
BLD-Foundation | 8/21/2008 | 8/22/2008 | 8/22/2008 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/21/2008 at 1:15:28 PM. Contact: ###-####. Tall interior shear walls OK pending STRATA special insp, tests and approvals.
|
BLD-Footing | 8/18/2008 | 8/19/2008 | 8/19/2008 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/18/2008 at 11:25:41 AM. Contact: ###-####. Footing at small section of South wall OK pending special insp STRATA ....tests and approvals.
|
BLD-Foundation | 8/13/2008 | 8/14/2008 | 8/14/2008 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/13/2008 at 1:49:55 PM. Contact: ###-####. West foundation wall and interior footing pad located at (mid) East side OK........ pending STRATA special insp, tests, and approvals.
|
BLD-Footing | 8/6/2008 | 8/7/2008 | 8/7/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/6/2008 at 2:01:58 PM. Contact: ###-####. wip on interior column pads and interior footings for concrete walls. Will hace special insp.
|
BLD-Footing | 8/1/2008 | 8/4/2008 | 8/4/2008 | A | PART |
Jim Sly
|
|
|
Gary Jones Phone #: ###-#### Footing OK pending special inspection (STRATA) tests and approvals.
|