BLD-Final | 11/4/2008 | 11/5/2008 | 11/5/2008 | A | PASS |
Jim Sly
|
|
|
ELE is final now OK for Perm Occ.
|
BLD-Final | 10/10/2008 | 10/13/2008 | 10/13/2008 | A | PART |
Jim Sly
|
|
|
joe Phone #: ###-#### OK for Temp Occ........OK to Perm when Electrical perms. (electr on Temp)
|
BLD-Final | 10/1/2008 | 10/1/2008 | 10/1/2008 | P | FAIL |
Jim Sly
|
|
|
Joe Would like this to be a temp final Phone #: ###-#### Need handrails at both sides......(2) stairways.
|
BLD-Final | 8/29/2008 | 8/29/2008 | 8/29/2008 | P | FAIL |
Jim Sly
|
|
|
dave Phone #: ###-#### C/N posted...... Note......Plumbing on Temp....
|
FIRE-Final Inspection | 8/28/2008 | 8/29/2008 | 8/29/2008 | A | PASS |
Troy Cobbley
|
|
|
fire life safety passed
|
FIRE-Final Inspection | 8/28/2008 | 8/28/2008 | 8/28/2008 | P | FAIL |
Troy Cobbley
|
|
|
The duct smoke detectors have not been installed correctly. Per the plans and HVAC schedules they are not required. I gave the contractor the option to either install and test or to remove the duct smoke detectors. All other items are ok.
|
BLD-Other | 8/19/2008 | 8/19/2008 | 8/19/2008 | P | PASS |
Jim Sly
|
|
|
david Note: ceiling grid Phone #: ###-####
|
BLD-Other | 8/15/2008 | 8/15/2008 | 8/15/2008 | P | NR |
Mike Jordan
|
|
|
Dave- ceiling grid Phone #: ###-####. Needs mech ri insp. first.
|
BLD-Framing/Rough-in | 7/15/2008 | 7/16/2008 | 7/16/2008 | A | PART |
Mike Jordan
|
|
|
dave Phone #: ###-####. 1hr ceiling enclosure on rated stairway.
|
BLD-Conference | 6/30/2008 | 7/1/2008 | 7/1/2008 | A | PASS |
Jim Sly
|
|
|
/Mark ###-#### 1hr wall /ceiling ok
|
BLD-Framing/Rough-in | 6/30/2008 | 6/30/2008 | 6/30/2008 | P | CANC |
Jim Sly
|
|
|
Mark Phone #: ###-####
|
FIRE-Final Inspection | 6/27/2008 | 6/27/2008 | 6/27/2008 | P | PART |
Forrest France
|
|
|
See city approved plans for area marked in red for tempory occupancy. As per Mark Senteno.Door hardware, exit signs, egress lights and fire extinguishers are approved.One hour rated fire wall shall be completed and approved by Jim Sly before area occupancy. KR
|
FIRE-Final Inspection | 6/25/2008 | 6/26/2008 | 6/26/2008 | A | PEND |
Forrest France
|
|
|
This permit was to be a fire conf. Not a final. Contractor wanted a tempory occupancy. Refered him to Dave Hannamen.KR
|
BLD-Framing/Rough-in | 6/25/2008 | 6/26/2008 | 6/26/2008 | A | PASS |
Jim Sly
|
|
|
Mark Phone #: ###-#### OK to cover 1hr walls and 1hr ceilings.
|
BLD-Framing/Rough-in | 6/19/2008 | 6/20/2008 | 6/20/2008 | A | DONE |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/19/2008 at 12:11:17 PM. Contact: ###-####. Conference with Mark.
|
BLD-Footing | 5/29/2008 | 5/30/2008 | 5/30/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/29/2008 at 4:21:18 PM. Contact: ###-####.wip.
|