BLD-Final | 12/15/2008 | 12/16/2008 | 12/16/2008 | P | PASS |
Jim Sly
|
|
|
GARY Phone #: ###-#### OK for Perm Occ
|
BLD-Final | 12/12/2008 | 12/12/2008 | 12/12/2008 | P | PART |
Jim Sly
|
|
|
gary Phone #: ###-#### OK for Temp Occ. OK for Perm when Plumb Perms.
|
BLD-Final | 12/10/2008 | 12/11/2008 | 12/11/2008 | A | NR |
Jim Sly
|
|
|
gary Phone #: ###-#### Need to install Firestop prot. @ 1hr ceiling for can lights.
|
BLD-Final | 12/8/2008 | 12/9/2008 | 12/9/2008 | A | CANC |
Jim Sly
|
|
|
gary Phone #: ###-####
|
BLD-Final | 12/5/2008 | 12/5/2008 | 12/5/2008 | P | NR |
Jim Sly
|
|
|
gary Phone #: ###-#### Need Ele final
|
FIRE-Final Inspection | 12/4/2008 | 12/4/2008 | 12/4/2008 | P | PASS |
Troy Cobbley
|
|
|
fire life safety passed
|
FIRE-Final Inspection | 11/26/2008 | 11/26/2008 | 11/26/2008 | P | PART |
Troy Cobbley
|
|
|
Per sam rogers a temporary is given until the exit discharge lighting as per the approved plans has been installed and tested.
|
BLD-Final | 11/24/2008 | 11/24/2008 | 11/24/2008 | P | PEND |
Jim Sly
|
|
|
Temp occupancy in the new area only-Gary Phone #: ###-#### Need approal from Fire.......
|
BLD-Energy code compliance | 10/14/2008 | 10/14/2008 | 10/14/2008 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/14/2008 at 9:14:07 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 10/6/2008 | 10/7/2008 | 10/7/2008 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/6/2008 at 2:49:09 PM. Contact: ###-####. Shear......OK to cover Exterior.
|
BLD-Foundation | 8/26/2008 | 8/27/2008 | 8/27/2008 | P | PART |
Jim Sly
|
|
|
paul Phone #: ###-#### Front entry OK
|
BLD-Footing | 8/25/2008 | 8/26/2008 | 8/26/2008 | A | PART |
Jim Sly
|
|
|
paul Phone #: ###-#### Not finished forming
|
BLD-Foundation | 8/20/2008 | 8/21/2008 | 8/21/2008 | P | PASS |
Jim Sly
|
|
|
paul - wall Phone #: ###-####
|
BLD-Footing | 8/19/2008 | 8/20/2008 | 8/20/2008 | A | PASS |
Jim Sly
|
|
|
paul Phone #: ###-####
|