BLD-Final | 12/29/2008 | 12/29/2008 | 12/29/2008 | A | PASS |
Jim Sly
|
|
|
C/C issued previously
|
DOC - Permit Finaled | 12/29/2008 | 12/29/2008 | 12/29/2008 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 12/23/2008 | 12/23/2008 | 12/23/2008 | P | PASS |
Jim Sly
|
|
|
Rod Phone ###-####
|
BLD-Final | 12/3/2008 | 12/3/2008 | 12/3/2008 | P | PASS |
Jim Sly
|
|
|
val Phone #: ###-#### C/C issued
|
FIRE-Final Inspection | 12/2/2008 | 12/3/2008 | 12/2/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. The fire hydrant at the property entrance that is mounted too high will be followed up on by the fire dept. Mark Sentenno is aware of the problem.
|
FIRE-Final Inspection | 11/26/2008 | 11/26/2008 | 11/26/2008 | P | FAIL |
Troy Cobbley
|
|
|
See the correction notice listed on the first page of the city approved plans.
|
BLD-Framing/Rough-in | 8/26/2008 | 8/26/2008 | 8/26/2008 | P | PASS |
Jim Sly
|
|
|
val Phone #: ###-####
|
BLD-Framing/Rough-in | 7/30/2008 | 7/31/2008 | 7/31/2008 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/30/2008 at 8:18:33 AM. Contact: ###-####. OK to start TI in selected area....
|
BLD-Other | 7/22/2008 | 7/22/2008 | 7/22/2008 | P | PASS |
Jim Sly
|
|
|
van Note: shear Phone #: ###-#### Shear OK
|
BLD-Other | 7/17/2008 | 7/21/2008 | 7/21/2008 | A | FAIL |
Jim Sly
|
|
|
val Note: shear Phone #: ###-#### Shear Fail.....Need to extend OSB shear all the way to 8x8 posts
|
BLD-Conference | 7/17/2008 | 7/21/2008 | 7/21/2008 | A | DONE |
Jim Sly
|
|
|
val Note: earliest as possible please - call 1/2 hr prior to inspection Phone #: ###-####
|
FIRE-Final Inspection | 6/13/2008 | 6/13/2008 | 6/13/2008 | P | CANC |
Troy Cobbley
|
|
|
Wrong inspection type called in.
|
BLD-Foundation | 6/13/2008 | 6/13/2008 | 6/13/2008 | P | PASS |
Jim Sly
|
|
|
Mark- founation wall Phone #: ###-####
|
BLD-Footing | 6/10/2008 | 6/11/2008 | 6/11/2008 | A | PASS |
Jim Sly
|
|
|
Mark Phone #: ###-#### Called Engineer....2500 PSI design.
|