BLD-Final | 6/17/2008 | 6/18/2008 | 6/18/2008 | P | PASS |
Jim Sly
|
|
|
Ray Phone #: ###-#### C/C issued
|
DOC - Permit Finaled | 6/18/2008 | 6/18/2008 | 6/18/2008 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 5/27/2008 | 5/28/2008 | 5/28/2008 | A | PASS |
Mike Jordan
|
|
|
corey Phone #: ###-####
|
BLD-Framing/Rough-in | 5/23/2008 | 5/27/2008 | 5/27/2008 | A | PASS |
Mike Jordan
|
|
|
ray Phone #: ###-####. All issues were resolved. ok to insul.
|
BLD-Framing/Rough-in | 5/22/2008 | 5/22/2008 | 5/22/2008 | P | FAIL |
Jim Storey
|
|
|
jay Phone #: ###-####TABLE R602.3(5) SIZE, HEIGHT AND SPACING OF WOOD STUDSa
STUD SIZE (inches) BEARING WALLS NONBEARING WALLS Laterally unsupported stud heighta (feet) Maximum spacing when supporting roof and ceiling only (inches) Maximum spacing when supporting one floor, roof and ceiling (inches) Maximum spacing when supporting two floors, roof and ceiling (inches) Maximum spacing when supporting one floor only (inches) Laterally unsupported stud heighta (feet) Maximum spacing (inches) 2 × 3b — — — — — 10 16 2 × 4 10 24 16 — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 24 — 24 16 24 2 × 6 10 24 24 16 24 20 24 max stud spacing 24 on 2x6/ 16 on 2x4
floor hanger hangers over nailled justify.
|
BLD-Foundation | 5/8/2008 | 5/8/2008 | 5/8/2008 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/8/2008 at 7:49:38 AM. Contact: ###-####.
|
BLD-Footing | 5/7/2008 | 5/7/2008 | 5/7/2008 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/7/2008 at 10:28:20 AM. Contact: ###-####.
|