Permit Information
Permit NumberBLD08-00659
StatusFinaled
Name GUHO CORP
Site Address 404 S 8TH ST Unit: 154
Project Name8TH STREET MARKETPLACE
Customer Number 
ePlanReviewNo
Description
**(Suite #154)**(8th Street Marketplace) To remodel an existing 2088 sq ft tenant space located on the lower level (Retail Use), and install an access stairway to an upper level (1st floor) 1734 sq ft space (Art Gallery/Assembly Area) and combine the two tenant spaces for a total area of 3822 sq ft. per approved plans. Work to include, new storefronts on both upper and lower tenant spaces, new doors and hardware, remove a portion of floor and structurally support per engineering, install new circular stair case, new floor and wall finishes, this building is fully fire sprinklered for one-hour substitution. RmH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/20/20092/23/20092/23/2009APASS
DetailsDave Hannah
rick Phone #: ###-#### ok for perm occ
FIRE-Final Inspection2/19/20092/20/20092/20/2009APASS
DetailsForrest France
Noted correction items verified for compliance, fire life safety passed.
BLD-Final7/9/20087/10/20087/10/2008APART
DetailsDave Hannah
Rick Phone #: ###-#### ok for temp needs to change door on upper level
FIRE-Final Inspection7/9/20087/10/20087/10/2008APART
DetailsForrest France
Fire life safety final pending door hardware at the main level second exit door and extension of the existing building fire alarm system to include notification throughout the tenant space.
BLD-Final7/2/20087/3/20087/3/2008PNR
DetailsDave Hannah
Rick Phone #: ###-#### needs fire finals
FIRE-Final Inspection7/2/20087/3/20087/3/2008AFAIL
DetailsForrest France
Noted project related fire sprinkler permit has not been issued and must be approved and finaled prior to building life safety final, noted heads improperly spaced above the new stairway. Reviewed additional items with the contractor including where to post two required fire extinguishers, door hardware at the second exit main level, EM lights and exit signs tested okay, stairway handrails under repair.
BLD-Final7/1/20087/2/20087/3/2008PFAIL
DetailsDave Hannah
rick Note: please inspect before 3:30 Phone #: ###-#### needs all of fires finals walked project with contractor made him apunch list
BLD-Framing/Rough-in6/3/20086/3/20086/4/2008PPART
DetailsDave Hannah
rick Phone #: ###-#### ok to cover store fronts