BLD-Final | 4/30/2009 | 4/30/2009 | 4/30/2009 | P | PASS |
Tony Young
|
|
|
Curt Phone #: ###-####,, rewalk job final ok now
|
BLD-Conference | 4/29/2009 | 4/30/2009 | 4/30/2009 | A | PASS |
Tony Young
|
|
|
Curt Phone #: ###-####,, rewalk job
|
BLD-Conference | 4/28/2009 | 4/29/2009 | 4/30/2009 | P | PASS |
Tony Young
|
|
|
Curt Phone #: ###-#### ?s on final
|
BLD-Final | 4/27/2009 | 4/28/2009 | 4/28/2009 | A | PART |
Tony Young
|
|
|
curt Phone #: ###-#### temp occupancy ok for the lower 3 levels only,, c/n on upper levels include landing areas greater than 4" openings on n/e corner tower,, ,, guardrails on n/west corner tower section over 4",, handrail into door landing area n/w main level,, section of parapets on west and south of 3rd and 4th lower than 42",, upper level parapets / guardrails more than 4" openings at steel joints w/in 42"
|
FIRE-Final Inspection | 4/24/2009 | 4/27/2009 | 4/27/2009 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection passed. NOTE: Elevator recall functions are car and hoistway specific- fire alarm system initiating and notification has not been required, therefore no fire alarm permit work is project attatched, notification devices at the elevator lobbys have been removed to meet these parameters.
|
FIRE-Conference | 4/22/2009 | 4/22/2009 | 4/22/2009 | P | DONE |
Forrest France
|
|
|
Regarding fire life safety requirements for project final.
|
BLD-Conference | 3/19/2009 | 3/19/2009 | 3/19/2009 | P | PART |
Tony Young
|
|
|
Curt Phone #: ###-#### ?s on final
|
BLD-Conference | 3/18/2009 | 3/19/2009 | 3/19/2009 | A | PART |
Tony Young
|
|
|
Curt Phone #: ###-#### ?s on final,, may want to get temp occ for the 1st two floors.. need all required sign offs,, need a letter of final ok on all structural elements from the structural engineer of record,, need hand rail and guard rails per code..
|
FIRE-Conference | 2/2/2009 | 2/2/2009 | 2/3/2009 | P | DONE |
Forrest France
|
|
|
Regarding seismic clearance for vertical standpipe runs.
|
BLD-Conference | 12/10/2008 | 12/11/2008 | 12/11/2008 | A | PASS |
Tony Young
|
|
|
kirt Phone #: ###-#### need to make wall min 42"
|
BLD-Conference | 12/8/2008 | 12/9/2008 | 12/10/2008 | A | PART |
Tony Young
|
|
|
kirt Phone #: ###-#### research,, called plan reviewer
|
BLD-Conference | 12/8/2008 | 12/8/2008 | 12/9/2008 | P | PART |
Tony Young
|
|
|
kirt Phone #: ###-#### need to research wall height
|
BLD-Conference | 12/5/2008 | 12/8/2008 | 12/8/2008 | A | CANC |
Tony Young
|
|
|
kirt Phone #: ###-####
|
BLD-Conference | 10/15/2008 | 10/16/2008 | 10/16/2008 | A | PART |
Tony Young
|
|
|
justin - please call 1/2 prior to inspection Phone #: ###-#### on site conf on guardrails,, w/ architect,, need to meet intent of code for designs
|
BLD-Footing | 6/23/2008 | 6/24/2008 | 6/24/2008 | A | PART |
Tony Young
|
|
|
Justin- concrete at 11 Phone #: ###-#### talked w/ strata guys,, ok on front/north ftg pads columns
|
BLD-Footing | 6/20/2008 | 6/23/2008 | 6/23/2008 | A | PART |
Tony Young
|
|
|
Justin- laying concrete at 11 Phone #: ###-#### pending S. ?I. report
|