BLD-Final | 4/20/2009 | 4/21/2009 | 4/21/2009 | A | PASS |
Dave Hannah
|
|
|
roddy Phone #: ###-####
|
DOC - Permit Finaled | 4/21/2009 | 4/21/2009 | 4/21/2009 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 3/9/2009 | 3/9/2009 | 3/9/2009 | P | PASS |
Jim Storey
|
|
|
reviewed handrail ok to have one rail to landing. two risers from landing to bonus rm. handrail not required/ shape and size of handrail tubing ok for const. back door of garage needs to swing our or need landing in the garage for door swinging over landing to exstend.
|
BLD-Energy code compliance | 12/29/2008 | 12/29/2008 | 12/29/2008 | P | PASS |
Dave Hannah
|
|
|
Roddy Phone #: ###-####
|
BLD-Framing/Rough-in | 12/19/2008 | 12/19/2008 | 12/19/2008 | P | PASS |
Dave Hannah
|
|
|
robby Phone #: ###-#### all c/n items completed ok to insulate
|
BLD-Framing/Rough-in | 12/18/2008 | 12/18/2008 | 12/18/2008 | P | FAIL |
Jim Sly
|
|
|
RODDY Phone #: ###-#### C/N.....Truss corr.....posted
|
BLD-Other | 9/10/2008 | 9/10/2008 | 9/10/2008 | P | PART |
Tony Young
|
|
|
Roddy- pre grout for fire place Phone #: ###-#### lower portion ok
|
BLD-Foundation | 7/21/2008 | 7/22/2008 | 7/22/2008 | A | PASS |
Dave Hannah
|
|
|
tom - stem wall Phone #: ###-####
|
BLD-Footing | 7/14/2008 | 7/15/2008 | 7/15/2008 | A | PASS |
Jim Storey
|
|
|
roddy Phone #: ###-####
|