BLD-Final | 11/25/2011 | 11/28/2011 | 11/28/2011 | P | PASS |
Jim Storey
|
|
|
Al Vreeland Phone #: ###-####
|
DOC - Permit Finaled | 11/28/2011 | 11/28/2011 | 11/28/2011 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 11/28/2011 | 11/28/2011 | 11/28/2011 | P | PASS |
Forrest France
|
|
|
Noted correction items verified for completion. Life safety passed. Note: signature card not available on site.
|
BLD-Aging Inspection | 11/10/2011 | 11/10/2011 | 11/10/2011 | | PASS |
Jim Storey
|
|
|
work will be completed with bld11-02207
|
BLD-Aging Inspection | 8/11/2011 | 8/11/2011 | 8/11/2011 | | NR |
Jim Storey
|
|
|
pending p&z/fire and bld finals. p&z has hold on project pending adminastrative action.
|
Extend Permit 90/180 days | 4/4/2011 | 4/4/2011 | 4/4/2011 | P | PASS |
Jim Storey
|
|
|
pending p&z/fire and bld finals. p&z has hold on project pending adminastrative action.
|
BLD-Aging Inspection | 4/4/2011 | 4/4/2011 | 4/4/2011 | | PASS |
Jim Storey
|
|
|
pending zoning activity.
|
BLD-Aging Inspection | 1/31/2011 | 1/31/2011 | 1/31/2011 | | DEFR |
Jim Storey
|
|
|
pending zoning activity.
|
BLD-Aging Inspection | 11/29/2010 | 11/29/2010 | 12/2/2010 | | NR |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 9/28/2010 | 9/28/2010 | 9/28/2010 | | NR |
Jim Storey
|
|
|
pending p&z isues
|
FIRE-Final Inspection | 7/27/2010 | 7/28/2010 | 7/29/2010 | P | NR |
Forrest France
|
|
|
Intended for an on site conference regarding fire life safety requirements. Discussion with contractor regarding exit signs, emergency lighting, door hardware, fire extinguishers, scope of permit work, occupant load signs, etc. Approved plans were not available on site for review. Advised contractor to also consult the attatched fire code review notes for details as well.
|
BLD-Conference | 7/23/2010 | 7/26/2010 | 7/26/2010 | P | PART |
Jim Storey
|
|
|
Al- please call at least 45 mins prior to inspection Phone #: ###-#### reviewed what is lacking for bld planrevied requriments.
|
BLD-Aging Inspection | 6/21/2010 | 6/21/2010 | 6/21/2010 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Aging Inspection | 4/19/2010 | 4/19/2010 | 4/19/2010 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Aging Inspection | 2/12/2010 | 2/12/2010 | 2/17/2010 | | PASS |
Jim Storey
|
|
|
pending zoning
|
BLD-Aging Inspection | 12/1/2009 | 12/1/2009 | 12/1/2009 | | PASS |
Jim Storey
|
|
|
no call for insp. pending trade finals.
|
BLD-Energy code compliance | 9/28/2009 | 9/28/2009 | 9/28/2009 | P | PASS |
Jim Storey
|
|
|
steve - late afternoon (after 3:30) please Phone #: ###-#### c/n for framing ok/ insulation ok to cover.
|
BLD-Framing/Rough-in | 9/23/2009 | 9/24/2009 | 9/24/2009 | A | PART |
Jim Storey
|
|
|
Steve-please call at least 45 mins prior to inspection Phone #: ###-#### backing for ada bars/ fire blk at floor line of dj area/ double studs under gurder truss at bearring point. ok to insulate.
|
BLD-Framing/Rough-in | 8/17/2009 | 8/18/2009 | 8/18/2009 | A | PASS |
Jim Storey
|
|
|
Steve-Sheet rock for fire wall Phone #: ###-#### 2 hr wall gyp atchment ok/ wall in place as per plan.
|
BLD-Aging Inspection | 8/11/2009 | 8/11/2009 | 8/11/2009 | | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 8/11/2009 | 8/11/2009 | 8/11/2009 | P | PASS |
Jim Storey
|
|
|
recieved revised roof framing plan for overspan rafters. aproved plans and archived city copy to maintane permited work set.
|
BLD-Aging Inspection | 6/10/2009 | 6/10/2009 | 6/10/2009 | | NR |
Jim Storey
|
|
|
|
BLD-Foundation | 4/10/2009 | 4/10/2009 | 4/10/2009 | P | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### east side
|
BLD-Footing | 4/9/2009 | 4/9/2009 | 4/9/2009 | P | PASS |
Jim Storey
|
|
|
steve Phone #: ###-#### ft and rebar ok
|
BLD-Other | 4/9/2009 | 4/9/2009 | 4/9/2009 | P | FAIL |
Jim Storey
|
|
|
work without a permit on entry on north side of the bld. not performed by contractor with permit. not in the scope of this bld. c/n isued to obtain aprovals from p&z and planreview.
|