BLD-Final | 8/27/2008 | 8/28/2008 | 8/28/2008 | P | PASS |
Jim Sly
|
|
|
Duane Phone #: ###-#### (it was requested that Jim Storey have this inspection) ///dld Verified final letter from STRATA.....No discrepancies......C/C issued.
|
DOC - Permit Finaled | 8/28/2008 | 8/28/2008 | 8/28/2008 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 8/27/2008 | 8/28/2008 | 8/28/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. The new fire hydrant has been installed roughly 60' to the west of the location shown on the approved plans but both Scott Arlleno and Mark Senteno are ok with it. Per Scott emergency lighting is not required either.
|
BLD-Framing/Rough-in | 8/25/2008 | 8/26/2008 | 8/26/2008 | A | PART |
Jim Storey
|
|
|
butch Phone #: ###-#### reviewed concret reports by special insp. strata.
|
BLD-Final | 8/22/2008 | 8/22/2008 | 8/22/2008 | P | NR |
Mike Jordan
|
|
|
Dave Phone #: ###-####. Needs elec, and fire/life/safety finals. Contractor was contacted.
|
BLD-Footing | 6/23/2008 | 6/24/2008 | 6/24/2008 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/23/2008 at 10:59:49 AM. Contact: ###-####.spec insp
|
BLD-Footing | 6/10/2008 | 6/11/2008 | 6/11/2008 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/10/2008 at 12:57:49 PM. Contact: ###-####.
|
BLD-Footing | 6/9/2008 | 6/9/2008 | 6/9/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 6/9/2008 at 7:57:25 AM. Contact: ###-####. Column pad footings, type A, for new bleachers, rows 7 to 15. Also noted project is receiving special insp.
|