Permit Information
Permit NumberBLD08-00902
StatusFinaled
Name SHILOH DEVELOPMENT LTD CO
Site Address 1708 S TOLUKA WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
Fire sprinklers are required. This house shall be fitted with a NFPA 13D system, modified to include a single row of dry sidewall sprinklers along all walls common to attached garage and the living space. The system shall also be equiped with an alarm initiating device commonly referred to as a a flow switch, and an outside alarm indicating device. A fire sprinkler permit is required prior to beginning any fire sprinkler permit. This permit is for the construction of a 3269 sqft single family dwelling with a casita, attached garage (797 sqft) and 272 sqft of covered patio, all per the approved plans, plan review report, any notations and the attached engineering. This lot is within the hillside area and is subject to the hillside ordinance. A class "A" roof system and defensible area will be maintained. The shower is not allowed in the casita.A letter from the applicant's geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at 384-3946. R-1C zoning, CFH-17 and setbacks per David Moser. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/15/200810/16/200810/16/2008PPASS
DetailsDave Hannah
Please Call Dan Appel. I have all inspections except waiting on Fire Sprinkler signoff Wednesday PM Phone #: ###-#### Internet Inspection Request from: Daniel Appel
DOC - Permit Finaled10/16/200810/16/200810/16/2008PPASS
DetailsDave Hannah
BLD-Grading Inspection10/15/200810/15/200810/15/2008ADONE
DetailsTerry Records
Final grading and drainage approved.
BLD-Energy code compliance8/11/20088/12/20088/12/2008PPASS
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Daniel Appel
BLD-Framing/Rough-in8/11/20088/12/20088/12/2008PPASS
DetailsDave Hannah
Truss Roll blocking, straps, and H-1 clips are complete. Phone #: ###-#### Internet Inspection Request from: Daniel Appel
BLD-Framing/Rough-in8/7/20088/8/20088/8/2008PPART
DetailsDave Hannah
Please call Dan Appel Phone #: ###-#### Internet Inspection Request from: Daniel Appel install roll blocking and uplift clips on trusses also strap top plates under 24 inch lap ok to insulate
BLD-Framing/Rough-in8/6/20088/7/20088/7/2008PCANC
DetailsDave Hannah
Please call Dan Appel Phone #: ###-#### Internet Inspection Request from: Daniel Appel Inspection cancelled from web by: Daniel Appel
BLD-Wall cover7/28/20087/29/20087/29/2008APART
DetailsTony Young
Please call Dan Appel before inspection to insure approved plans onsite. Phone #: ###-#### Internet Inspection Request from: Daniel Appel
ext ok to cover
BLD-Wall cover7/22/20087/24/20087/24/2008PFAIL
DetailsMike Jordan
Shear wall inspection. Del Morton (framer- ###-####)has the structural engineer approved nailing schedule for staples. Phone #: ###-#### Internet Inspection . Request from: Daniel Appel. No approved plans on site. Noted to framer that builder needs to have approved plans on site for inspection.
BLD-Wall cover7/16/20087/17/20087/17/2008PNR
DetailsDave Hannah
Shear inspection Phone #: ###-#### Internet Inspection Request from: Daniel Appel no approved plans on site framer used staples not nails and theres no sub chart on plans
BLD-Foundation6/23/20086/24/20086/24/2008APART
DetailsDave Hannah
Chris; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Footing6/22/20086/23/20086/23/2008APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 6/22/2008 at 11:00:34 AM. Contact: ###-####.