BLD-Final | 1/15/2009 | 1/16/2009 | 1/16/2009 | A | PASS |
Tom Arcoraci
|
|
|
cecil Phone #: ###-####
|
FIRE-Final Inspection | 1/13/2009 | 1/13/2009 | 1/13/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 12/11/2008 | 12/12/2008 | 12/12/2008 | A | PART |
Tom Arcoraci
|
|
|
doug Phone #: ###-#### ok to occ as marked on plan
|
FIRE-Final Inspection | 12/11/2008 | 12/11/2008 | 12/11/2008 | A | PART |
Troy Cobbley
|
|
|
See the city approved plans for the third floor lobby and related rooms, as marked on the plans with todays date, that are ok to occupy.
|
BLD-Wall cover | 12/2/2008 | 12/2/2008 | 12/2/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 12/1/2008 | 12/1/2008 | 12/1/2008 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/1/2008 at 7:25:02 AM. Contact: ###-####.
|
BLD-Final | 11/10/2008 | 11/10/2008 | 11/10/2008 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/10/2008 at 7:36:58 AM. Contact: ###-#### ok for occ part 2nd floor
|
BLD-Other | 10/29/2008 | 10/29/2008 | 10/29/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/29/2008 at 7:20:38 AM. Contact: ###-####. ceiling grid need to wire up mec and clip or install spreader bars on edges
|
FIRE-Final Inspection | 10/27/2008 | 10/28/2008 | 10/28/2008 | A | FAIL |
Troy Cobbley
|
|
|
This inspection was actually for a conference on fire alarm requirements
|
BLD-Framing/Rough-in | 9/30/2008 | 9/30/2008 | 9/30/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/30/2008 at 8:02:27 AM. Contact: ###-####. interior framed walls, rms 312,313.
|
BLD-Aging Inspection | 9/23/2008 | 9/23/2008 | 9/23/2008 | | PASS |
Mike Jordan
|
|
|
wip
|