Code Occupancy Approval | | | 4/1/2010 | | DONE |
Barbara Stitt
|
|
|
Bond released 6-15-09 ok to final
|
DOC - Permit Finaled | | | 4/1/2010 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Aging Inspection | 3/9/2010 | 3/9/2010 | 3/12/2010 | | DEFR |
Jim Storey
|
|
|
to barb
|
BLD-Aging Inspection | 1/7/2010 | 1/7/2010 | 1/8/2010 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 12/22/2008 | 12/22/2008 | 12/22/2008 | P | PASS |
Jim Storey
|
|
|
david Phone #: ###-#### p/z bond on file/ esc frozen.
|
DOC - Permit Finaled | 12/22/2008 | 12/22/2008 | 12/22/2008 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 12/19/2008 | 12/22/2008 | 12/22/2008 | A | DEFR |
Forrest France
|
|
|
Intended for structural final inspection, notified contractor.
|
BLD-Energy code compliance | 11/19/2008 | 11/20/2008 | 11/20/2008 | A | PASS |
Jim Storey
|
|
|
david Phone #: ###-####
|
BLD-Framing/Rough-in | 11/17/2008 | 11/18/2008 | 11/18/2008 | A | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Conference | 10/21/2008 | 10/21/2008 | 10/21/2008 | P | PASS |
Jim Storey
|
|
|
steve Phone #: ###-####
|
BLD-Framing/Rough-in | 10/13/2008 | 10/14/2008 | 10/14/2008 | P | PART |
Jim Storey
|
|
|
john - shear wall Phone #: ###-#### nailling on exterior ok. door on north side of bldg. moved and p/z must reapprove.
|
BLD-Other | 9/29/2008 | 9/30/2008 | 9/30/2008 | A | PART |
Jim Storey
|
|
|
john Note: fire walls Phone #: ###-#### as per aproved plan
|
BLD-Foundation | 8/22/2008 | 8/25/2008 | 8/25/2008 | A | PASS |
Jim Storey
|
|
|
Dave- pouring at 10 Phone #: ###-####
|
BLD-Footing | 8/18/2008 | 8/19/2008 | 8/19/2008 | A | PART |
Jim Storey
|
|
|
dave Phone #: ###-####
|