FIRE-Final Inspection | 6/8/2009 | 6/8/2009 | 6/8/2009 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 5/10/2009 | 5/11/2009 | 5/11/2009 | A | PASS |
Tom Arcoraci
|
|
|
The City plan review set of drawings are at the customer counter of Snake River Pool & Spa. Phone #: ###-#### Internet Inspection Request from: Mark Bowen
|
BLD-Aging Inspection | 4/6/2009 | 4/6/2009 | 4/6/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 2/3/2009 | 2/3/2009 | 2/3/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 12/4/2008 | 12/4/2008 | 12/4/2008 | | NR |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 9/4/2008 | 9/5/2008 | 9/5/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 9/3/2008 | 9/4/2008 | 9/4/2008 | P | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for deficiencies marked in red which include inactive exit sign at the east exit, additional emergency light/exit sign in the new show room and the removal of locks on the new show room double doors into the existing show room area.
|
BLD-Framing/Rough-in | 8/5/2008 | 8/5/2008 | 8/5/2008 | P | PASS |
Dave Hannah
|
|
|
All framing is complete. Phone #: ###-#### Internet Inspection Request from: Mark Bowen
|
BLD-Framing/Rough-in | 7/10/2008 | 7/10/2008 | 7/10/2008 | P | PART |
Tom Arcoraci
|
|
|
Partial framing in conjunction with BLD08-001003 Phone #: ###-#### Internet Inspection Request from: Mark Bowen
|