Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD08-01055
StatusFinaled
Name NATIONAL BUILDING CONTRACTORS
Site Address 350 N MILWAUKEE ST Unit: 2060
Project NameBTS - #2060
Customer Number 
ePlanReviewNo
Description
(FOREVER 21 - BOISE TOWNE SQUARE - SPACE 2060) To remodel 7 existing retail spaces to create one 15,837 square foot retail space per approved plans. Work to include: [installation of new non-combustible interior partition walls to create, two accessible restrooms, 19 regular changing rooms, 1 accessible changing room, two stock rooms, and a large retail sales area,] installation of new flooring throughout, construction of a new storefront system, installation of suspended gypsum ceiling system and related lighting, installation of 4 new rooftop mechanical units, installation of new gilles/ducks/diffusers/, and miscellaneous related interior finishes in compliance with ch. 8 of the 2006 IBC. This building is fully fire sprinklerd any alterations to the sprinkler system shall be maintained per NFPA #13 as regulated by the fire department, The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. Any Racking installed in excess of 8 ft. tall will require a separate permit.**TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/15/200810/16/200810/16/2008PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/15/2008 at 12:30:57 PM. ok for perm occ.
FIRE-Final Inspection10/15/200810/16/200810/16/2008PPASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection10/13/200810/14/200810/14/2008AFAIL
DetailsTroy Cobbley
Remove the nonrequired exit sign, install door hardware so it can be verified and install and tag fire extinguishers as discussed.
BLD-Other9/4/20089/5/20089/5/2008APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/4/2008 at 8:06:20 AM. Contact: ###-####. grid for hardlid, center portion. ok
BLD-Other8/28/20088/29/20088/29/2008APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/28/2008 at 8:20:09 AM. Contact: ###-####. framing for hardlids on eas and west ends of store. Center section not ready . Pending elc. and mech. ri insp.
BLD-Framing/Rough-in8/20/20088/21/20088/21/2008APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/20/2008 at 11:30:18 AM. Framing for hardlids and backing in restrooms for ada. Also combustibles were removed and replaced. ok.
BLD-Framing/Rough-in8/14/20088/15/20088/18/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/14/2008 at 8:35:11 AM. Contact: ###-####. Interior framed walls only. no grid or hardlids. Needs to in stall backing for ada restrooms, remove combustible backing.