BLD-Final | 12/22/2008 | 12/22/2008 | 12/22/2008 | P | PASS |
Dave Hannah
|
|
|
john Phone #: ###-####
|
DOC - Permit Finaled | | | 12/22/2008 | | DONE |
Darla L Downs
|
|
|
Letter of compliance issued
|
FIRE-Final Inspection | 12/19/2008 | 12/19/2008 | 12/19/2008 | P | PASS |
Forrest France
|
|
|
Fire life safety final inspection completed satisfactory.
|
BLD-Framing/Rough-in | 12/16/2008 | 12/17/2008 | 12/17/2008 | P | PART |
Dave Hannah
|
|
|
john - ceiling Phone #: ###-#### ok to cover ceiling in last section
|
BLD-Framing/Rough-in | 12/5/2008 | 12/5/2008 | 12/8/2008 | P | PART |
Dave Hannah
|
|
|
john Phone #: ###-#### ok to cover entry
|
FIRE-Final Inspection | 12/1/2008 | 12/1/2008 | 12/1/2008 | P | PART |
Forrest France
|
|
|
John Pnone#: ###-####
|
BLD-Framing/Rough-in | 11/25/2008 | 11/26/2008 | 11/26/2008 | A | PART |
Jim Sly
|
|
|
john Phone #: ###-#### Frame OK at Phase 3.......Wound and healing area.
|
BLD-Framing/Rough-in | 11/17/2008 | 11/18/2008 | 11/18/2008 | A | PART |
Dave Hannah
|
|
|
john Phone #: ###-#### ok to cover ceiling in entryway
|
FIRE-Final Inspection | 11/14/2008 | 11/17/2008 | 11/17/2008 | P | PART |
Forrest France
|
|
|
Fire life safety okayed for remodel areas completed to date.
|
BLD-Final | 11/14/2008 | 11/14/2008 | 11/14/2008 | P | CANC |
Dave Hannah
|
|
|
John this is for a temp only Phone #: ###-####ok to move into pn2
|
FIRE-Final Inspection | 11/13/2008 | 11/14/2008 | 11/14/2008 | A | NR |
Forrest France
|
|
|
Inspection for one portion of the remodel area work completed including the reception/waiting rooms, hall 118, cast rm., lymph. room, and some exam rooms. Need project related fire sprinkler work repairs, need to add an additional PFE for the east side as discussed, some missing door hardware.
|
BLD-Framing/Rough-in | 11/12/2008 | 11/12/2008 | 11/12/2008 | P | CANC |
Dave Hannah
|
|
|
john - ceiling Phone #: ###-#### pn 2 wound and healing section ok to cover ceiling
|
BLD-Framing/Rough-in | 10/29/2008 | 10/30/2008 | 10/31/2008 | P | PART |
Dave Hannah
|
|
|
john Phone #: ###-####
|
FIRE-Final Inspection | 10/22/2008 | 10/22/2008 | 10/23/2008 | P | PART |
Forrest France
|
|
|
Partial for work completed to date.
|
BLD-Framing/Rough-in | 10/15/2008 | 10/16/2008 | 10/16/2008 | A | PART |
Dave Hannah
|
|
|
kevin Phone #: ###-#### wound clinck ph 1 ok to cover walls
|
BLD-Final | 9/19/2008 | 9/22/2008 | 9/22/2008 | A | NR |
Dave Hannah
|
|
|
Kevin Phone #: ###-####
|
FIRE-Final Inspection | 9/19/2008 | 9/19/2008 | 9/19/2008 | P | FAIL |
Forrest France
|
|
|
Cannot perform a life safety until fire sprinkler resubmittals have been approved due to the use of sprinkler flex heads that were not shown on sprinkler plans. KR
|
BLD-Framing/Rough-in | 9/16/2008 | 9/17/2008 | 9/17/2008 | A | PART |
Dave Hannah
|
|
|
Kevin- ceiling Phone #: ###-#### ok to cover ceilings in section a part 1
|
BLD-Framing/Rough-in | 8/29/2008 | 8/29/2008 | 8/29/2008 | P | PART |
Dave Hannah
|
|
|
Kevin Phone #: ###-#### wrilpool room ok to cover
|
BLD-Framing/Rough-in | 8/15/2008 | 8/18/2008 | 8/18/2008 | A | PART |
Dave Hannah
|
|
|
Kevin Phone #: ###-#### ok to cover walls in section A or phase 1
|
BLD-Framing/Rough-in | 8/11/2008 | 8/11/2008 | 8/11/2008 | P | PART |
Dave Hannah
|
|
|
kevin Phone #: ###-#### talked to super about how to do phased projects
|