BLD-Final | 12/3/2009 | 12/3/2009 | 12/3/2009 | P | PASS |
Tom Arcoraci
|
|
|
Ryan Phone #: ###-####
|
BLD - Request for Extension | 11/23/2009 | 11/23/2009 | 11/23/2009 | | PASS |
Bob Archibald
|
|
|
30 day extension on temp. occ. approved. Letter on file.
|
FIRE-Final Inspection | 10/26/2009 | 10/27/2009 | 10/27/2009 | A | PASS |
Forrest France
|
|
|
C/N items verified for completion, fire life safety approved for final status.
|
BLD-Framing/Rough-in | 10/23/2009 | 10/23/2009 | 10/23/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 10/22/2009 | 10/23/2009 | 10/23/2009 | A | PART |
Tom Arcoraci
|
|
|
bryan Phone #: ###-####
|
BLD-Wall cover | 9/29/2009 | 9/29/2009 | 9/29/2009 | P | PASS |
Tom Arcoraci
|
|
|
ryan Phone #: ###-####
|
FIRE-Conference | 9/14/2009 | 9/14/2009 | 9/14/2009 | A | DONE |
Forrest France
|
|
|
Regarding items remaining for final and prior C/N list request.
|
BLD-Final | 8/21/2009 | 8/24/2009 | 8/24/2009 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 8/21/2009 at 4:11:44 PM. Contact: ###-####. will need final letter of ok from structural engineer,,, dentist office not finished and can not be occupied,, need trades finaled all the way
|
FIRE-Final Inspection | 8/21/2009 | 8/24/2009 | 8/24/2009 | A | PART |
Forrest France
|
|
|
Items on C/N verified for compliance, fire life safety is satisfactory pending completion of the loop road at the north end of the building and completion of finishes at the dental office.
|
FIRE-Final Inspection | 8/20/2009 | 8/21/2009 | 8/21/2009 | P | FAIL |
Forrest France
|
|
|
See stamped plan set for locations of repair items including four non-functional exit signs, one EM light, provide one missing exit sign, remove one exit sign, provide two additional EM lights, loop road at the north end of the building is not finished, remainder of life safety okayed.
|
BLD-Wall cover | 8/7/2009 | 8/10/2009 | 8/10/2009 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/7/2009 at 2:26:30 PM. Contact: ###-####. ceilling in kitchen ok to cover.
|
BLD-Wall cover | 7/29/2009 | 7/29/2009 | 7/29/2009 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/29/2009 at 10:06:15 AM. Contact: ###-####.
|
BLD-Wall cover | 7/8/2009 | 7/10/2009 | 7/10/2009 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/8/2009 at 11:28:16 AM. Contact: ###-####.
|
BLD-Conference | 6/12/2009 | 6/12/2009 | 6/12/2009 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/12/2009 at 8:13:54 AM. Contact: ###-####.
|
BLD-Conference | 6/12/2009 | 6/12/2009 | 6/12/2009 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 6/4/2009 | 6/5/2009 | 6/5/2009 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/4/2009 at 3:25:04 PM. Contact: ###-####.
|
BLD-Wall cover | 5/20/2009 | 5/20/2009 | 5/20/2009 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/20/2009 at 9:06:58 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/30/2009 | 5/1/2009 | 5/1/2009 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/30/2009 at 11:05:00 AM. Contact: ###-####. wip ok
|
BLD-Wall cover | 4/22/2009 | 4/22/2009 | 4/22/2009 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/22/2009 at 9:03:34 AM. Contact: ###-####. wip ok
|
BLD-Framing/Rough-in | 4/8/2009 | 4/9/2009 | 4/9/2009 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/8/2009 at 10:30:34 AM. Contact: ###-####. wip ok
|
BLD-Energy code compliance | 3/20/2009 | 3/20/2009 | 3/20/2009 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/20/2009 at 8:02:47 AM. Contact: ###-####.
|
BLD-Wall cover | 3/12/2009 | 3/13/2009 | 3/13/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 3/10/2009 | 3/12/2009 | 3/12/2009 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/10/2009 at 3:09:06 PM. Contact: ###-####.
|
BLD-Wall cover | 3/11/2009 | 3/12/2009 | 3/12/2009 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 3/10/2009 | 3/11/2009 | 3/11/2009 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/10/2009 at 3:08:19 PM. Contact: ###-####.
|
BLD-Energy code compliance | 2/28/2009 | 3/2/2009 | 3/2/2009 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/28/2009 at 11:24:13 AM. Contact: ###-####.
|
BLD-Wall cover | 2/26/2009 | 2/27/2009 | 2/27/2009 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/26/2009 at 4:40:49 PM. Contact: ###-####.
|
BLD-Other | 2/27/2009 | 2/27/2009 | 2/27/2009 | A | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Framing/Rough-in | 2/25/2009 | 2/25/2009 | 2/25/2009 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/25/2009 at 8:10:55 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/18/2009 | 2/18/2009 | 2/18/2009 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/18/2009 at 9:56:19 AM. Contact: ###-####. wip ok
|
BLD-Framing/Rough-in | 2/3/2009 | 2/3/2009 | 2/3/2009 | P | PASS |
Tom Arcoraci
|
|
|
ryan Phone #: ###-####
|
BLD-Framing/Rough-in | 1/15/2009 | 1/16/2009 | 1/16/2009 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/15/2009 at 9:29:59 AM. Contact: ###-####. partial roof nailing ok
|
BLD-Aging Inspection | 1/13/2009 | 1/13/2009 | 1/13/2009 | | PASS |
Tom Arcoraci
|
|
|
wip ok spec insp
|
BLD-Foundation | 11/5/2008 | 11/5/2008 | 11/6/2008 | P | PASS |
Mike Jordan
|
|
|
Interior footings at area D.
|
BLD-Energy code compliance | 11/6/2008 | 11/6/2008 | 11/6/2008 | P | PASS |
Mike Jordan
|
|
|
Rigid insulation at interior side of stemwall at area D.
|
BLD-Foundation | 11/4/2008 | 11/5/2008 | 11/5/2008 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/4/2008 at 11:40:19 AM. Contact: ###-####.
|
BLD-Foundation | 10/29/2008 | 10/30/2008 | 10/30/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/29/2008 at 1:17:02 PM. Contact: ###-####. Interior footings for bearing walls at area A. Will have special insp.
|
BLD-Energy code compliance | 10/30/2008 | 10/30/2008 | 10/30/2008 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/29/2008 at 1:17:02 PM. Contact: ###-####. Rigid foam insul on interior side of stemwall at area A.
|
BLD-Footing | 10/23/2008 | 10/24/2008 | 10/24/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/23/2008 at 3:34:29 PM. Contact: ###-####. Interior footings and column pad and grade beam footings for canopy at east side of area D.
|
BLD-Concrete | 10/8/2008 | 10/9/2008 | 10/9/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/8/2008 at 2:03:07 PM. Column pad footings for courtyard canopy and enterance to community center. Stemwalls for area A. Also reviewed RFI from engineer regarding lapsplices for vertical reinforcement from stemwall to masonry wall . 36 inches is required, only 32 inches on in place work. Will have detail electronically scanned into bldg. permit.
|
BLD-Foundation | 10/2/2008 | 10/3/2008 | 10/3/2008 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/2/2008 at 1:33:42 PM. Contact: ###-####. si need lap ?
|
BLD-Foundation | 9/23/2008 | 9/24/2008 | 9/24/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/23/2008 at 12:42:46 PM. Contact: ###-####. Stemwalls for gym, cafetria, and denta office. Will have special insp.
|
BLD-Concrete | 9/15/2008 | 9/16/2008 | 9/16/2008 | A | PASS |
Jim Storey
|
|
|
Ryan ###-#### 2000 ft ft bar ok/ need rfi from engineer for pipes under ft. si ok
|