Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD08-01105
StatusFinaled
Name BENITON CONSTRUCTION
Site Address 1609 S OWYHEE ST
Project NameWhitney Elementary School
Customer Number 
ePlanReviewNo
Description
Whitney Elementary School - To construct a new one story, wood frame and masonry elementary school building and related site improvements. The building is separated into three buildings, for allowable area purposes, by two-hour fire walls. Building "A" is 12,650 square feet, contains classroom areas and is located on the northwest corner of the school. Building "B" is 4,805 square feet and contains the gymnasium, dental clinic, small office and storage areas. Building "B" is located on the south end of the school. Building "C" is 40,825 square feet and comprises the remainder of the building. Building "C" contains the cafeteria, kitchen, administration offices, library, multi-purpose community area and classrooms. This building also contains attic mechanical spaces. This school is fully fire sprinkled. The sprinklers are used for building area increase. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/3/200912/3/200912/3/2009PPASS
DetailsTom Arcoraci
Ryan Phone #: ###-####
BLD - Request for Extension11/23/200911/23/200911/23/2009 PASS
DetailsBob Archibald
30 day extension on temp. occ. approved. Letter on file.
FIRE-Final Inspection10/26/200910/27/200910/27/2009APASS
DetailsForrest France
C/N items verified for completion, fire life safety approved for final status.
BLD-Framing/Rough-in10/23/200910/23/200910/23/2009PPASS
DetailsTom Arcoraci
BLD-Framing/Rough-in10/22/200910/23/200910/23/2009APART
DetailsTom Arcoraci
bryan Phone #: ###-####
BLD-Wall cover9/29/20099/29/20099/29/2009PPASS
DetailsTom Arcoraci
ryan Phone #: ###-####
FIRE-Conference9/14/20099/14/20099/14/2009ADONE
DetailsForrest France
Regarding items remaining for final and prior C/N list request.
BLD-Final8/21/20098/24/20098/24/2009PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 8/21/2009 at 4:11:44 PM. Contact: ###-####.
will need final letter of ok from structural engineer,,, dentist office not finished and can not be occupied,, need trades finaled all the way
FIRE-Final Inspection8/21/20098/24/20098/24/2009APART
DetailsForrest France
Items on C/N verified for compliance, fire life safety is satisfactory pending completion of the loop road at the north end of the building and completion of finishes at the dental office.
FIRE-Final Inspection8/20/20098/21/20098/21/2009PFAIL
DetailsForrest France
See stamped plan set for locations of repair items including four non-functional exit signs, one EM light, provide one missing exit sign, remove one exit sign, provide two additional EM lights, loop road at the north end of the building is not finished, remainder of life safety okayed.
BLD-Wall cover8/7/20098/10/20098/10/2009APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/7/2009 at 2:26:30 PM. Contact: ###-####. ceilling in kitchen ok to cover.
BLD-Wall cover7/29/20097/29/20097/29/2009PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/29/2009 at 10:06:15 AM. Contact: ###-####.
BLD-Wall cover7/8/20097/10/20097/10/2009APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/8/2009 at 11:28:16 AM. Contact: ###-####.
BLD-Conference6/12/20096/12/20096/12/2009PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/12/2009 at 8:13:54 AM. Contact: ###-####.
BLD-Conference6/12/20096/12/20096/12/2009APASS
DetailsTom Arcoraci
BLD-Conference6/4/20096/5/20096/5/2009PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/4/2009 at 3:25:04 PM. Contact: ###-####.
BLD-Wall cover5/20/20095/20/20095/20/2009PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/20/2009 at 9:06:58 AM. Contact: ###-####.
BLD-Framing/Rough-in4/30/20095/1/20095/1/2009APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 4/30/2009 at 11:05:00 AM. Contact: ###-####. wip ok
BLD-Wall cover4/22/20094/22/20094/22/2009PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 4/22/2009 at 9:03:34 AM. Contact: ###-####. wip ok
BLD-Framing/Rough-in4/8/20094/9/20094/9/2009PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 4/8/2009 at 10:30:34 AM. Contact: ###-####. wip ok
BLD-Energy code compliance3/20/20093/20/20093/20/2009PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/20/2009 at 8:02:47 AM. Contact: ###-####.
BLD-Wall cover3/12/20093/13/20093/13/2009PPASS
DetailsTom Arcoraci
BLD-Energy code compliance3/10/20093/12/20093/12/2009PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/10/2009 at 3:09:06 PM. Contact: ###-####.
BLD-Wall cover3/11/20093/12/20093/12/2009APASS
DetailsTom Arcoraci
BLD-Wall cover3/10/20093/11/20093/11/2009PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/10/2009 at 3:08:19 PM. Contact: ###-####.
BLD-Energy code compliance2/28/20093/2/20093/2/2009PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 2/28/2009 at 11:24:13 AM. Contact: ###-####.
BLD-Wall cover2/26/20092/27/20092/27/2009PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 2/26/2009 at 4:40:49 PM. Contact: ###-####.
BLD-Other2/27/20092/27/20092/27/2009APASS
DetailsTom Arcoraci
wip ok
BLD-Framing/Rough-in2/25/20092/25/20092/25/2009PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 2/25/2009 at 8:10:55 AM. Contact: ###-####.
BLD-Framing/Rough-in2/18/20092/18/20092/18/2009PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 2/18/2009 at 9:56:19 AM. Contact: ###-####. wip ok
BLD-Framing/Rough-in2/3/20092/3/20092/3/2009PPASS
DetailsTom Arcoraci
ryan Phone #: ###-####
BLD-Framing/Rough-in1/15/20091/16/20091/16/2009APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 1/15/2009 at 9:29:59 AM. Contact: ###-####. partial roof nailing ok
BLD-Aging Inspection1/13/20091/13/20091/13/2009 PASS
DetailsTom Arcoraci
wip ok spec insp
BLD-Foundation11/5/200811/5/200811/6/2008PPASS
DetailsMike Jordan
Interior footings at area D.
BLD-Energy code compliance11/6/200811/6/200811/6/2008PPASS
DetailsMike Jordan
Rigid insulation at interior side of stemwall at area D.
BLD-Foundation11/4/200811/5/200811/5/2008ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/4/2008 at 11:40:19 AM. Contact: ###-####.
BLD-Foundation10/29/200810/30/200810/30/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/29/2008 at 1:17:02 PM. Contact: ###-####. Interior footings for bearing walls at area A. Will have special insp.
BLD-Energy code compliance10/30/200810/30/200810/30/2008PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/29/2008 at 1:17:02 PM. Contact: ###-####. Rigid foam insul on interior side of stemwall at area A.
BLD-Footing10/23/200810/24/200810/24/2008APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/23/2008 at 3:34:29 PM. Contact: ###-####. Interior footings and column pad and grade beam footings for canopy at east side of area D.
BLD-Concrete10/8/200810/9/200810/9/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/8/2008 at 2:03:07 PM. Column pad footings for courtyard canopy and enterance to community center. Stemwalls for area A. Also reviewed RFI from engineer regarding lapsplices for vertical reinforcement from stemwall to masonry wall . 36 inches is required, only 32 inches on in place work. Will have detail electronically scanned into bldg. permit.
BLD-Foundation10/2/200810/3/200810/3/2008PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/2/2008 at 1:33:42 PM. Contact: ###-####. si need lap ?
BLD-Foundation9/23/20089/24/20089/24/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/23/2008 at 12:42:46 PM. Contact: ###-####. Stemwalls for gym, cafetria, and denta office. Will have special insp.
BLD-Concrete9/15/20089/16/20089/16/2008APASS
DetailsJim Storey
Ryan ###-#### 2000 ft ft bar ok/ need rfi from engineer for pipes under ft. si ok